What is Test Completion and Test Completion Activity? (2024)

Testing software is essential, and one of the key things we need to think about is test completion. That means ensuring we’ve run all the tests we need and analyzed the results. But test completion isn’t just about ticking off a list of tests and logging any issues we find. It involves many activities to ensure the software is well-tested and meets high-quality standards.

In this blog post, we’ll look at what test completion means and everything we need to do to ensure we’re doing it right.

Before we begin, here’s something to humor you:

“What do you call a software tester who’s always late?

A Regression tester.”

What is Test Completion and Test Completion Activity? (1)

Table Of Contents

  • 1 What is Test Completion?
    • 1.1 What is the purpose of Test Completion?
  • 2 What are the Test Completion Work Products?
  • 3 When do Test Completion Activities Occur?
  • 4 Major Activities of Test Completion
  • 5 What is the Test Completion Criterion?
    • 5.1 Test Completion Criteria – Examples:
    • 5.2 Test Completion Criteria for Test Levels
    • 5.3 Test Completion Criteria – Significance:
  • 6 What is the test completion report in software testing?
    • 6.1 Test Completion Report Format:
    • 6.2 Significance of Test Completion Report:
  • 7 Conclusion
  • 8 Frequently Asked Questions
    • 8.1 What risks do you see in test completion?

What is Test Completion?

Test completion is the last step in the software testing life cycle, where we finalize all testing activities and document the results. Our main goal is to ensure the software product is ready for production release.

The activities involved in test completion can vary depending on the project but typically include the following:

  • Verifying that all test cases have been executed
  • Analyzing the test results and identifying any defects
  • Prioritizing and fixing defects
  • Generating a test completion report
  • Communicating the test results to stakeholders

The test completion report is a document that summarizes the results of the testing activities.

What is the purpose of Test Completion?

A clear sense of purpose is essential to success in any endeavor. When it comes to testing a software product, we must ensure we’ve done everything possible to ensure it’s ready for release. That’s where test completion criteria come in – the specific conditions we need to meet before stopping testing.

Things like

  • how many test cases we’ve run,
  • how much of the code we’ve covered,
  • how many bugs we’ve found and fixed, and
  • how risky the product is in determining when we’re done testing.

It’s essential to have these measures defined in the test plan and agreed upon by everyone involved so that we’re all on the same page and can work efficiently.

What are the Test Completion Work Products?

The work products of the test completion phase are the following:

  • Test summary report: This report summarizes the testing efforts carried out during the testing process. It provides information on the amount of testing that was done, the defects that were found, and the risks that were identified. The test summary report is an essential input for stakeholders who need to make decisions about the software, such as whether to release it to production.
  • Defer requests or product backlog objects: If defects cannot be fixed in the current release, they are added to the product backlog as change requests. In some cases, the requirements may not specify defects or functionalities. These are also added to the product backlog as change requests.
  • Action items for progress: The test completion phase is also an opportunity to identify lessons learned and recommend modification. These action items should be documented and implemented in future projects.
  • Completed testware: All relevant test work products and documents, such as test cases, test results, and test plans, are completed and archived in this phase. This ensures that the test results are preserved and can be used for future reference.

When do Test Completion Activities Occur?

A few times during a project, we celebrate our progress and completion. These moments are called project milestones, and they’re a chance for us to cheer each other on and take a breather before diving into the next phase.

Below are some instances when test completion activities occur:

  • When a software system is all ready to go live
  • When we finish up a testing project (or decide to take a break)
  • When we complete a round of an Agile project
  • When we finish up a whole level of testing
  • When we’ve assembled a maintenance release. Woohoo!

Major Activities of Test Completion

Completing a test is a fun and exciting process that involves several essential activities!

First, we ensure all the reported defects have been addressed and closed. If there are any open defects, we create change requests or product backlog items to ensure they are handled. We also close out any incident reports and document our acceptance of the system.

Next, we create a test summary report that gives a broad overview of all the testing we completed and the results we found. We share this report with our stakeholders so they can see all our hard work! Before we wrap things up, we finalize and archive all our test materials to be used again. We also transfer any relevant information to maintenance teams or other stakeholders who may find it useful.

Finally, we take the time to analyze what we learned during the testing process so we can improve and grow in the future. We want to ensure we’re constantly enhancing and improving what we do!

Here are someexamples for the significant test activities completion:

  • Checking whether all defect reports are closed.
  • Entering change requests or product backlog items for any defects that remain open.
  • Closing incident reports.
  • Documenting the system’s acceptance.
  • Finalizing and archiving the test environment, the test data, the test infrastructure, and other testware for later reuse.
  • Handing over the testware to the maintenance teams, other project teams, or other stakeholders who could benefit from its use.
  • Checking which planned deliverables have been delivered.
  • Analyzing lessons learned from the completed test activities to determine changes needed for future iterations, releases, and projects.
  • Using the information gathered to improve test process maturity.

What is the Test Completion Criterion?

To determine when a software product is ready for release, Test Completion Criteria (TCC) must be met. These conditions should be clearly defined in the test plan and agreed upon by all stakeholders. This ensures a consistent and efficient testing process.

TCC can be determined based on factors such as

  1. the number of executed test cases,
  2. code coverage percentage,
  3. fixed defects, and
  4. software product risk level.

TCC must be specific, measurable, achievable, relevant, and time-bound. This ensures clarity and objective evaluation.

Test Completion Criteria – Examples:

For example, TCC might include

  • executing all test cases,
  • achieving 80% code coverage,
  • fixing all critical defects, or
  • reducing software product risk to an acceptable level.

TCC should be reviewed and updated throughout testing to remain relevant and achievable.

Test Completion Criteria for Test Levels

Here are the completion criteria for different levels:

  • Unit testing:
    1. All unit test cases have been executed and passed.
    2. The code coverage has met the defined requirements.
    3. All critical defects have been found and fixed.
  • Integration testing:
    1. All integration test cases have been executed and passed.
    2. The interfaces between components are working as expected.
    3. All critical defects have been found and fixed.
  • System testing:
    1. All system test cases have been executed and passed.
    2. The system meets all of the requirements.
    3. All critical defects have been found and fixed.
  • User acceptance testing:
    1. All user acceptance test cases have been executed and passed.
    2. The system meets the needs of the users.
    3. All critical defects have been found and fixed.
  • Acceptance testing:
    1. The customer has accepted the system.
    2. The system is ready to be released to production.

These are just some examples of test completion criteria for different test levels. The specific criteria will vary depending on the particular project and the risks associated with the software product.

It is important to note that test completion criteria should be defined in the test plan and agreed upon by all stakeholders. This helps to confirm everyone is on the same page and that the testing process is completed consistently and efficiently.

Test Completion Criteria – Significance:

Here are some of the benefits of having clear TCC:

  • It helps to ensure that the testing process is complete and thorough.
  • It helps to avoid scope creep, where the testing process continues indefinitely.
  • It helps to manage the risks associated with software testing.
  • It helps ensure the software product is released on time and within budget.

What is the test completion report in software testing?

The test completion report in software testing is a thorough document summarizing the testing process and providing an overview of the test results. It is a formal record of the testing activities conducted during a specific testing phase or project.

The test completion report aims to communicate the testing effort’s status, effectiveness, and quality to project managers, developers, and clients. It includes detailed information about the tests executed, their outcomes, any issues encountered, and recommendations for further actions.

Various automation testing tools available in the market, such as Testsigma, can significantly expedite this process. Utilizing such tools can result in a 5X increase in efficiency, thereby enhancing the overall productivity of your work.


Test Completion Report Format:

Generally, a complete report has the following format.

  • Test Name: Specify the name of the test that was conducted.
  • Test Objective: Clearly state the objective or purpose of the test.
  • Test Date: Mention the date when the test was conducted.
  • Test Environment: Describe the environment in which the test was performed, including hardware, software, and network configurations.
  • Test Scope: Define the scope of the test, indicating what functionalities or areas were covered during testing.
  • Test Duration: Specify how long it took to complete the testing process.
  • Test Team: List all team members involved in conducting the test, including their roles and responsibilities.
  • Test Cases Executed: Provide a summary of all test cases executed during testing, including successful and failed ones.
  • Defects Identified: Enumerate all defects or issues discovered during testing, along with their severity levels and descriptions.
  • Defect Resolution Status: Indicate whether each identified defect has been resolved or is still pending resolution.
  • Test Results Summary: These components are essential for tracking the progress and outcomes of the testing process, ensuring that all issues are addressed and resolved effectively.

This image shows the Test Completion Report and how to export it in Testsigma.

What is Test Completion and Test Completion Activity? (2)

Significance of Test Completion Report:

The Test Completion Report is very important as it summarizes the testing process and its results. It proves the testing activities, such as the executed test cases, identified defects, and their solutions. This report helps stakeholders evaluate the quality and dependability of the software being tested, aiding them in making informed decisions about its release or further enhancements. Furthermore, it guides future testing cycles, allowing teams to learn from past experiences and strengthen their testing approaches for better outcomes.

Conclusion

In a nutshell, Test completion is when all the tests are done and the results are noted down. So, if you ever hear someone talking about Test completion, now you know precisely what they’re talking about!

Have fun with your testing!

Frequently Asked Questions

What risks do you see in test completion?

One risk in test completion is overlooking critical defects or issues that could impact the product’s functionality. Another risk is the potential for inadequate test coverage, leading to gaps in testing and potential vulnerabilities being missed.

What is Test Completion and Test Completion Activity? (2024)

FAQs

What is test completion? ›

Test Completion is the last stage of the software testing life cycle. It results in a report that is a Test manager or a Test lead prepares that showcases the completed data from the test execution. Let's understand the key activities carried out in test closure.

What is completion test or short answer test? ›

Completion questions require a student to complete a statement that is missing one or more key elements (words, phrases, numbers, etc.). Similar to matching and true/false, completion questions are considered better for assessing lower levels of cognition, and are best to check whether key facts have been memorized.

How much testing is enough answer? ›

Enough testing is the minimal amount of testing that yields a software system that satisfies the stakeholders' expectation perfectly. Too little testing is the amount of testing that yields a software system the falls short of the stakeholders' expectation.

What is complete test definition? ›

A test approach in which the test suite comprises all combinations of input values and preconditions.

What is activity completion? ›

Activity Completion is a way to add completion tasks to important content and allow students to see their completion of such content through the course. This also allows staff to see which activities students have interacted with, to monitor their progression.

What is the meaning of completion completion? ›

the act of finishing something that you are doing or making: on completion You'll be paid on completion of the project. near completion The road repair work is nearing completion (= almost finished). Thesaurus: synonyms, antonyms, and examples. the final part of something.

What is a short answer and completion item? ›

A completion item requests that students fill-in a blank space with the most appropriate response. A short-answer item requires that students provide a written response to a question rather than simply a fill-in the blank type response.

When to use a completion test? ›

The uses of sentence completion tests include personality analysis, clinical applications, attitude assessment, achievement motivation, and measurement of other constructs. They are used in several disciplines, including psychology, management, education, and marketing.

How do you take a short answer test? ›

Short answer questions in exams
  1. Deconstruct the question. ...
  2. Rephrase the question in your own words.
  3. Plan the structure of your answer before starting to write. ...
  4. Use examples to give evidence and help give your writing credibility.
  5. Use plain language and keep your writing straight to the point.

What is the most common answer on a test? ›

I'm sure you've heard this at some point “if you don't know the answer, always guess C. because it's the most common correct option”. That's just a myth, and generally there are no most common answers on multiple choice tests.

How do you answer test questions? ›

Read each question thoroughly before looking at your choices. Come up with the answer in your head before looking at the possible answers, this way the choices given on the test won't throw you off or trick you. Be sure to read all the answers before selecting the correct one.

How can you determine how much testing is enough? ›

There are no predefined rules that you can use to find how much testing is enough. Visualize project situations, project readiness, and timelines to decide on your own. In practice, the goal is to strike a balance between thorough testing and project constraints.

What is the meaning of test of completion? ›

Tests on Completion means such tests which are prescribed by the specifications or have been mutually agreed to between the Contractor/Supplier and the Purchaser to be made before the equipment is taken over by the Purchaser.

What is completeness testing? ›

The intent of Completeness testing is to evaluate whether you have received a full set of data - data anomalies can be explored further after the preliminary testing (for example, malformed dates, NA information, etc.).

What is the purpose of TestComplete? ›

TestComplete gives testers the ability to create automated tests for Microsoft Windows, Web, Android (operating system), and iOS applications. Tests can be recorded, scripted or manually created with keyword driven operations and used for automated playback and error logging.

What is the meaning of completed test? ›

If the status is COMPLETED, it indicates that the student finished their test.

What are the criteria to be considered for test completion? ›

The two most common criteria are these: Stop when the scheduled time for testing expires. Stop when all the test cases execute without detecting errors; that is, stop when the test cases are unsuccessful.

What is the meaning of TestComplete? ›

TestComplete is an automated testing environment for a wide range of application types and technologies, including (but not limited to) Windows, . NET, WPF, Visual C++, Visual Basic, Delphi, C++Builder, Java and Web applications and services. TestComplete is oriented equally to functional and unit testing.

How do you know when testing is complete? ›

The final step to determine when testing is complete is to review your test results and evaluate your testing performance. You should analyze your test data, such as test cases, test execution, test coverage, defect reports, and defect resolution, to assess the quality and completeness of your testing process.

Top Articles
How To Make Peace With Your Financial Past
Everything you need to know to be a smart investor - Global Banking | Finance
Maxtrack Live
Cappacuolo Pronunciation
Libiyi Sawsharpener
123 Movies Black Adam
Jazmen Jafar Linkedin
Online Reading Resources for Students & Teachers | Raz-Kids
Explore Tarot: Your Ultimate Tarot Cheat Sheet for Beginners
Falgout Funeral Home Obituaries Houma
Professor Qwertyson
Jesus Revolution Showtimes Near Chisholm Trail 8
Hover Racer Drive Watchdocumentaries
Hardly Antonyms
Natureza e Qualidade de Produtos - Gestão da Qualidade
Watch TV shows online - JustWatch
UEQ - User Experience Questionnaire: UX Testing schnell und einfach
Best Fare Finder Avanti
Rainfall Map Oklahoma
Idaho Harvest Statistics
Rams vs. Lions highlights: Detroit defeats Los Angeles 26-20 in overtime thriller
List of all the Castle's Secret Stars - Super Mario 64 Guide - IGN
Odfl4Us Driver Login
Noaa Ilx
Marine Forecast Sandy Hook To Manasquan Inlet
Grimes County Busted Newspaper
Amazing Lash Studio Casa Linda
Governor Brown Signs Legislation Supporting California Legislative Women's Caucus Priorities
How Long After Dayquil Can I Take Benadryl
Is Holly Warlick Married To Susan Patton
Dashboard Unt
Egusd Lunch Menu
Martins Point Patient Portal
Isablove
How often should you visit your Barber?
Khatrimmaza
Vistatech Quadcopter Drone With Camera Reviews
Gr86 Forums
Play 1v1 LOL 66 EZ → UNBLOCKED on 66games.io
Elgin Il Building Department
Frank 26 Forum
Www Craigslist Com Brooklyn
60 X 60 Christmas Tablecloths
California Craigslist Cars For Sale By Owner
Sand Castle Parents Guide
Best GoMovies Alternatives
Jamesbonchai
Promo Code Blackout Bingo 2023
Powerboat P1 Unveils 2024 P1 Offshore And Class 1 Race Calendar
Ratchet And Clank Tools Of Destruction Rpcs3 Freeze
Craigslist Cars For Sale By Owner Memphis Tn
Latest Posts
Article information

Author: Ouida Strosin DO

Last Updated:

Views: 6217

Rating: 4.6 / 5 (76 voted)

Reviews: 91% of readers found this page helpful

Author information

Name: Ouida Strosin DO

Birthday: 1995-04-27

Address: Suite 927 930 Kilback Radial, Candidaville, TN 87795

Phone: +8561498978366

Job: Legacy Manufacturing Specialist

Hobby: Singing, Mountain biking, Water sports, Water sports, Taxidermy, Polo, Pet

Introduction: My name is Ouida Strosin DO, I am a precious, combative, spotless, modern, spotless, beautiful, precious person who loves writing and wants to share my knowledge and understanding with you.