What are the common challenges and risks of conducting PQ and UAT in parallel or sequentially? (2024)

Last updated on Aug 20, 2024

  1. All
  2. Computer System Validation

Powered by AI and the LinkedIn community

1

Benefits of parallel testing

2

Challenges of parallel testing

3

Benefits of sequential testing

4

Challenges of sequential testing

5

Tips for successful testing

6

Here’s what else to consider

Computer system validation (CSV) is a critical process to ensure that software and hardware meet their intended purpose and comply with regulatory requirements. Two important stages of CSV are performance qualification (PQ) and user acceptance testing (UAT). PQ verifies that the system performs consistently under normal and stress conditions, while UAT confirms that the system meets the user's needs and expectations. But how should you conduct PQ and UAT in parallel or sequentially? What are the common challenges and risks of each approach? In this article, we will explore some of the pros and cons of both methods and provide some tips to help you plan and execute your CSV project effectively.

Top experts in this article

Selected by the community from 9 contributions. Learn more

What are the common challenges and risks of conducting PQ and UAT in parallel or sequentially? (1)

Earn a Community Top Voice badge

Add to collaborative articles to get recognized for your expertise on your profile. Learn more

  • What are the common challenges and risks of conducting PQ and UAT in parallel or sequentially? (3) 8

  • What are the common challenges and risks of conducting PQ and UAT in parallel or sequentially? (5) 2

What are the common challenges and risks of conducting PQ and UAT in parallel or sequentially? (6) What are the common challenges and risks of conducting PQ and UAT in parallel or sequentially? (7) What are the common challenges and risks of conducting PQ and UAT in parallel or sequentially? (8)

1 Benefits of parallel testing

One of the advantages of conducting PQ and UAT in parallel is that it can save time and resources. By testing the system's functionality and usability at the same time, you can avoid duplication of efforts and reduce the testing cycle. Parallel testing can also help you identify and resolve issues faster, as you can leverage the feedback from both testers and users. Additionally, parallel testing can increase the confidence and satisfaction of the stakeholders, as they can see the progress and results of the validation process.

Add your perspective

Help others by sharing more (125 characters min.)

    • Report contribution

    1.Resource: Running PQ and UAT simultaneously can strain resources, both activities may require same personnel, environments, or data sets, causing conflicts and scheduling issues.2.Coordination and Comms: Coordinating between teams becomes complex, increasing the chances of miscomm. Ensuring everyone is on the same page regarding test, issues, and dependencies is critical.3.Environment: Environment must be stable to support PQ and UAT without influencing the outcome of either. Fluctuations in performance during PQ could impact UAT results, vice versa.4. Issue Identification: When tests run in parallel, it may be difficult to identify whether the issue is from the system's performance or functionality or UI, complicating troubleshooting.

    Like

    What are the common challenges and risks of conducting PQ and UAT in parallel or sequentially? (17) 8

    • Report contribution

    While the benefits of parallel testing are clear, it's important to note that it requires a high level of coordination and communication between different teams. Additionally, the simultaneous identification of issues could lead to a bottleneck in resolving them. However, with a robust risk mitigation strategy and clear communication channels, these challenges can be effectively managed. Furthermore, leveraging tools like JIRA or HP-ALM can streamline the process and enhance the efficiency of parallel testing.

    Like

    What are the common challenges and risks of conducting PQ and UAT in parallel or sequentially? (26) 2

  • Naveen Bandi 🌱 Cultivating Excellence: Meet the Pharma Graduate with a Passion for Validation and Compliance! 🌿🔬
    • Report contribution

    Conducting Performance Qualification (PQ) and User Acceptance Testing (UAT) either in parallel or sequentially presents several challenges and risks:Resource Constraints: Limited time and personnel can hinder effective testing, leading to incomplete assessments and potential product issues.Communication Gaps: Misunderstandings between teams can result in conflicting priorities and unclear requirements, delaying the testing process.Ambiguous Requirements: Vague specifications can cause confusion during testing, complicating the validation process and increasing the risk of defects.Schedule Conflicts: Tight timelines may force compromises on thoroughness, risking the quality and reliability of the final product

    Like
    • Report contribution

    Reduced Overall Timeline: By running both PQ and UAT at the same time, the overall project timeline can be significantly shortened, leading to faster product delivery.Immediate Feedback: Issues identified in PQ and UAT can be addressed in real-time, allowing for quicker adjustments and refinements to the system.Efficient Resource Utilization: Resources can be utilized more effectively when different teams focus on their respective testing phases simultaneously, rather than waiting for one phase to complete.Reduced Downtime: If both tests identify issues, addressing them in parallel can minimize system downtime compared to waiting for one phase to complete before starting the next.

    Like

2 Challenges of parallel testing

However, parallel testing also comes with some challenges and risks that you need to consider. One of the main challenges is to coordinate and communicate effectively between the PQ and UAT teams. You need to ensure that both teams have a clear understanding of the scope, objectives, criteria, and deliverables of their respective tests. You also need to establish a mechanism to share and track the test results, issues, and changes across the teams. Another challenge is to manage the expectations and involvement of the users. You need to ensure that the users are adequately trained, informed, and supported during the UAT, and that their feedback is properly documented and addressed.

Add your perspective

Help others by sharing more (125 characters min.)

    • Report contribution

    Parallel testing indeed presents challenges, particularly in coordinating between PQ and UAT teams. From my experience in computer system validation, it's crucial to establish a robust communication framework that allows for real-time tracking and sharing of test results, issues, and changes. Additionally, user involvement is a critical aspect that can make or break the success of UAT. Therefore, I emphasize on adequate user training and support, and a systematic approach to document and address their feedback.It is possible for a PQ test to limit performance or verify performance limits and negatively affect a UAT result.

    Like

    What are the common challenges and risks of conducting PQ and UAT in parallel or sequentially? (51) 1

3 Benefits of sequential testing

Another option for conducting PQ and UAT is to do them sequentially, that is, to complete one test before starting the other. This approach can have some benefits, such as simplifying the testing process and reducing the complexity and uncertainty. Sequential testing can also help you ensure that the system meets the technical requirements and specifications before exposing it to the users. This can prevent potential errors, defects, and rework that could affect the user experience and satisfaction. Furthermore, sequential testing can allow you to focus on one test at a time and allocate the resources and attention accordingly.

Add your perspective

Help others by sharing more (125 characters min.)

    • Report contribution

    Sequential testing in computer system validation (CSV) indeed simplifies the process and reduces complexity. However, it's crucial to consider that this approach may extend the overall project timeline, as one phase cannot begin until the previous one is completed. Additionally, while sequential testing can prevent potential errors, it may also delay their detection until later stages, which could potentially increase the cost and effort of remediation. Maybe a balance between sequential and parallel testing might be the most efficient approach.Also, in sequential testing, the time element can be addressed using automation for both PQ and UAT. However, the automated tests won't be of value until after the first release of the system.

    Like

    What are the common challenges and risks of conducting PQ and UAT in parallel or sequentially? (60) 1

4 Challenges of sequential testing

However, sequential testing also has some drawbacks and risks that you need to be aware of. One of the main drawbacks is that it can prolong the testing cycle and increase the costs. By doing one test after the other, you may miss the opportunity to optimize the testing activities and leverage the synergies between the PQ and UAT teams. Sequential testing can also delay the identification and resolution of issues, as you may discover problems that could have been detected earlier in the other test. Another drawback is that it can affect the engagement and feedback of the users. By doing the UAT after the PQ, you may limit the user's input and influence on the system design and functionality.

Add your perspective

Help others by sharing more (125 characters min.)

    • Report contribution

    From my experience in computer system validation (CSV), the sequential testing approach, while methodical, can indeed lead to longer testing cycles and increased costs. It's crucial to balance this approach with parallel testing where possible to optimize resources and time. Early engagement of UAT teams can provide valuable insights into system design and functionality, potentially identifying issues earlier in the testing process. This can also help maintain user engagement and feedback, which is critical for successful CSV.

    Like

    What are the common challenges and risks of conducting PQ and UAT in parallel or sequentially? (69) 1

5 Tips for successful testing

Whether you choose to conduct PQ and UAT in parallel or sequentially, there are tips to help you achieve a successful CSV project. It is important to plan and document your testing strategy, scope, objectives, criteria, roles, responsibilities, and deliverables in advance. Additionally, align your testing activities with the project schedule, milestones, and dependencies. Communication and collaboration with all stakeholders should be encouraged; this includes the PQ and UAT teams, users, developers, vendors, and regulators. Following best practices and standards for testing is also essential; this includes using test scripts, cases, scenarios, data, and tools. Lastly, record and report test results, issues, changes and deviations in a traceable and transparent manner. Reviewing and evaluating the testing process and outcomes should be done as well; corrective and preventive actions should be implemented if needed.

Add your perspective

Help others by sharing more (125 characters min.)

    • Report contribution

    In my experience, the success of any CSV project, whether running PQ and UAT in parallel or sequentially, hinges largely on meticulous planning and clear communication. It's crucial to have a well-defined user requirement specification that outlines who is responsible for testing each requirement. This includes identifying performance-related requirements. This not only ensures accountability but also helps in managing risks and maintaining compliance with regulatory guidelines such as 21 CFR §11 and FDA/EMA regulations. Furthermore, it's essential to align testing activities with project schedules and milestones, and to keep all stakeholders informed and involved throughout the process.

    Like

    What are the common challenges and risks of conducting PQ and UAT in parallel or sequentially? (78) 1

6 Here’s what else to consider

This is a space to share examples, stories, or insights that don’t fit into any of the previous sections. What else would you like to add?

Add your perspective

Help others by sharing more (125 characters min.)

    • Report contribution

    In my experience, conducting Performance Qualification (PQ) and User Acceptance Testing (UAT) in parallel can significantly expedite the validation process, but it requires meticulous planning and coordination. It's critical to ensure that any issues identified in PQ do not impact UAT, as this could lead to rework and delays. On the other hand, sequential testing allows for a more controlled approach, but it could extend the project timeline. Regardless of the approach, a thorough risk assessment should be conducted to determine the best strategy.In terms of System Performance, a firm must always know its high-risk requirements and test them adeptly in a PQ.

    Like

    What are the common challenges and risks of conducting PQ and UAT in parallel or sequentially? (87) 1

Computer System Validation What are the common challenges and risks of conducting PQ and UAT in parallel or sequentially? (88)

Computer System Validation

+ Follow

Rate this article

We created this article with the help of AI. What do you think of it?

It’s great It’s not so great

Thanks for your feedback

Your feedback is private. Like or react to bring the conversation to your network.

Tell us more

Report this article

More articles on Computer System Validation

No more previous content

  • How do you manage changes and updates to the validated system? 59 contributions
  • How do you handle changes and deviations during and after the validation process? 23 contributions
  • How do you monitor and maintain the performance and quality of AI/ML systems after deployment? 17 contributions
  • What are common myths about computer system validation and how do you debunk them? 38 contributions
  • What are the current trends in validation documentation and reporting? 25 contributions
  • How do you document and report the results and deviations of validation for AI and ML systems? 11 contributions
  • What are the best tools for testing and verifying your computer system validation outcomes? 22 contributions
  • How do you manage the validation lifecycle of a computer system from inception to retirement? 42 contributions
  • How do you conduct and report the validation testing activities and results? 22 contributions
  • What are the best practices for conducting a risk assessment and mitigating potential issues? 6 contributions
  • How do you leverage automation and data analytics for performance qualification? 1 contribution
  • How do you align your periodic review strategy with your business objectives and needs? 6 contributions
  • How do you define the scope and purpose of CSV vs verification? 16 contributions
  • What are the tools and techniques that can help you perform a periodic review faster and easier? 2 contributions
  • How do you balance speed and rigor in performance qualification in agile? 3 contributions

No more next content

See all

More relevant reading

  • Computer System Validation How do you define the scope and objectives of user acceptance testing for CSV?
  • Computer System Validation How do you document and report the results and issues of user acceptance testing for CSV?
  • Application Support What are the best tools and methods for performing regression testing after a software update?
  • Software Testing How can you ensure that defects are validated and verified before closing them?

Are you sure you want to delete your contribution?

Are you sure you want to delete your reply?

What are the common challenges and risks of conducting PQ and UAT in parallel or sequentially? (2024)
Top Articles
How Much Should a Big Mac Cost?
How to Video Call on Tango (with Pictures) - wikiHow
Where To Go After Howling Pit Code Vein
Skylar Vox Bra Size
Mcgeorge Academic Calendar
Hannaford Weekly Flyer Manchester Nh
Blanchard St Denis Funeral Home Obituaries
Collision Masters Fairbanks
Melfme
Erskine Plus Portal
Lichtsignale | Spur H0 | Sortiment | Viessmann Modelltechnik GmbH
Buckaroo Blog
12 Best Craigslist Apps for Android and iOS (2024)
Cincinnati Bearcats roll to 66-13 win over Eastern Kentucky in season-opener
Winterset Rants And Raves
Yakimacraigslist
G Switch Unblocked Tyrone
Traveling Merchants Tack Diablo 4
Company History - Horizon NJ Health
A Person That Creates Movie Basis Figgerits
Routing Number For Radiant Credit Union
Regina Perrow
Riverstock Apartments Photos
10-Day Weather Forecast for Santa Cruz, CA - The Weather Channel | weather.com
The Clapping Song Lyrics by Belle Stars
Dl.high Stakes Sweeps Download
Craigslist Texas Killeen
Plato's Closet Mansfield Ohio
Truckers Report Forums
Best Weapons For Psyker Darktide
Build-A-Team: Putting together the best Cathedral basketball team
Ludvigsen Mortuary Fremont Nebraska
Compare Plans and Pricing - MEGA
Hellgirl000
Ferguson Employee Pipeline
Who Is Responsible for Writing Obituaries After Death? | Pottstown Funeral Home & Crematory
California Craigslist Cars For Sale By Owner
Nina Flowers
Lyndie Irons And Pat Tenore
Jamesbonchai
Sour OG is a chill recreational strain -- just have healthy snacks nearby (cannabis review)
Craigslist Com St Cloud Mn
Cleveland Save 25% - Lighthouse Immersive Studios | Buy Tickets
Costco The Dalles Or
Mytmoclaim Tracking
Barback Salary in 2024: Comprehensive Guide | OysterLink
Oak Hill, Blue Owl Lead Record Finastra Private Credit Loan
Kenmore Coldspot Model 106 Light Bulb Replacement
De Donde Es El Area +63
28 Mm Zwart Spaanplaat Gemelamineerd (U999 ST9 Matte | RAL9005) Op Maat | Zagen Op Mm + ABS Kantenband
Pauline Frommer's Paris 2007 (Pauline Frommer Guides) - SILO.PUB
Latest Posts
Article information

Author: Francesca Jacobs Ret

Last Updated:

Views: 6169

Rating: 4.8 / 5 (48 voted)

Reviews: 87% of readers found this page helpful

Author information

Name: Francesca Jacobs Ret

Birthday: 1996-12-09

Address: Apt. 141 1406 Mitch Summit, New Teganshire, UT 82655-0699

Phone: +2296092334654

Job: Technology Architect

Hobby: Snowboarding, Scouting, Foreign language learning, Dowsing, Baton twirling, Sculpting, Cabaret

Introduction: My name is Francesca Jacobs Ret, I am a innocent, super, beautiful, charming, lucky, gentle, clever person who loves writing and wants to share my knowledge and understanding with you.