Software Development Timeline: How Long Does It Take To Build Custom Software? (2024)

In this article, we describe the three main phases that a custom software project goes through, and the typical duration of each step. Understanding a typical custom software development timeline can help you make more informed and effective decisions for your business.

No two projects are alike or take the same amount of time to build. However, in our experience around 80% of the projects we work on fall into the software development timeline template presented below.

Are you considering building a custom software project and need a better understanding of how long it takes? Keep reading to learn more!Software Development Timeline: How Long Does It Take To Build Custom Software? (1)

Building Software is like Building a House

When planning and estimating a software engineering timeline and overall project, we consider each of the following phases separately:

  • Requirements & Design
  • Planning, Architecture & Development
  • Software Testing

If you are familiar with building a custom home, the process for software is very similar. It is an analogy I use often.

The Requirements & Design phase equates to deciding on the type of house you want and then having an architect draw the blueprints for your home. At the end of this phase, you will have a concrete plan for your software application. At that point, all architecturally significant and budgetary impactful decisions should be made so that you can start the implementation with few to no surprises later on.

Planning, Architecture & Development is the same as scheduling the contractors, pouring the foundation and constructing the house. In the case of software, a project manager schedules creative designers, technical architects, software engineers, etc.

The architects design the software foundation and framework, the creative designers create the user experience, and the software engineers make all the logic work. At the end of this phase, the application is fully built and you have got to use it yourself.

Just like a house, before you can move in, you need to make sure the application meets certain standards. You can think of the last phase of the project, Software Testing, like the inspections, walk-throughs, and punch-out of a house.

A Typical Custom Software Development Schedule

Requirements & Design: 2-4 Weeks

In software development, the Requirements & Design phase is predictable and short. As the decision maker and primary stakeholder, you will work with your chosen IT team to:

  • Document the system requirements (the things that the software must accomplish)
  • Collaborate on different ideas and application features that will work together to meet your system requirements
  • Discuss your users, their capabilities, and the desired look and feel for the application
  • Document and review the application design (your application blueprint) and discuss any last minute changes
  • Decide on the initial scope of the project (what are the features you are building in the first release vs. later releases)

We typically see that a Requirements & Design phase takes 2-4 weeks. You can pencil that in as part of your own software project timeline template. The duration depends largely on the availability of you and your team, responsiveness to design reviews and questions, and how long it takes to make critical decisions.

Planning, Architecture & Development: 3-6 Months

Planning is the activity of laying out all the tasks in order, assigning the resources, and seeing which tasks can be done at the same time and which can’t.

For example, you can’t put the roof on until the framing is done. Similarly, you can’t hang the drywall until the plumbing and electricity are finished. Planning is a short activity performed prior to development work and typically lasts 2-3 days. However, it’s only one part of this phase.

Once planning is done, the system needs a framework or structure to build on. The technical architecture defines which technologies will be used and how they will work together.

Like planning, the technical architecture tends to be straightforward unless the project involves complex system integrations or incorporates complicated or unusual technologies. The architecture of a system takes anywhere between one to two weeks to develop. The exact timeline depends on the size of the system and its complexity.

The largest amount of time in software development is spent coding the application. Once the system is designed and the technical foundation is decided, we typically see the application built in 3-6 months.

This is perhaps the most exciting phase in the project timeline for software development. It’s where your concept and the crucial design and planning work begin to transform into functional software.

Let us do the heavy lifting.

Are you ready to start a new software development project? Work with our local team of software designers and developers or let us help you recruit a team of your own.

Get In Touch

If the timeline needs to be accelerated, planning, architecture, and development is the most common phase in the project to do so. With multiple tasks to be accomplished, additional development resources can be added to speed up the effort.

At a certain point, however, the additional resources will actually cause a decrease in efficiency. That may sound counter-intuitive at first, but there’s a clear reason why that dropoff happens. It’s due to additional coordination and planning needed, not to mention the potential for developers and other stakeholders to step on each other’s toes.

Testing: 3-6 weeks

Depending on your project, there is a variety of testing that could and should be used. All projects should undergo end-to-end testing and user acceptance testing. End-to-end testing is using all the features and functions of a system as a user would.

During development, features are tested in isolation but not as a unified whole. Once all of the software is developed, an end-to-end test exercises the system holistically. That approach allows the tester to compare what was built to the original specifications and any changes in design made along the way.

A user acceptance test (UAT) is a period of time where you, the stakeholder, use the system and sign off on the development. You can consider it like a final walkthrough of a custom home. Your job is to look at everything, identify any issues that the testers may have missed, and start to get ready for production.

There are additional types of testing that you can elect to have done, such as cross-browser or cross-mobile-device testing, load testing, performance testing, and integration testing. If your application will be used on multiple browsers or mobile devices, you can choose to test on several different browsers/devices. This helps to ensure your application looks and works well on all browsers/devices that your user might choose.

If your application will have many users on the system at the same time, or will process a lot of data and must respond to the users within a certain time frame, load and performance testing should be considered. Load and performance testing makes sure that your application can handle heavy loads and identifies the slowest areas of your application for improvement, respectively.

If your application will interact with third-party systems, integration testing should be considered. Integration testing sends both expected and unexpected data through the connection of two systems. This testing process makes sure they handle all the known and unexpected permutations of data and situations (a timeout, a corrupted file, an invalid value, etc.) gracefully.

Depending on the size of your application and the extent of the testing needed, we see most testing efforts taking between 3-6 weeks.

Software Development Timeline: How Long Does It Take To Build Custom Software? (6)

Conclusion

On average, we see a software development timeline of 4-9 months. The size and complexity of the project are the biggest factors in its overall duration. A project is considered large or has a greater complexity if any of the following apply:

  • Involves 25+ screens
  • Includes an administrative portal as well as a user application
  • Supports multiple platforms (web, tablet, phone, iOS, Android, Windows Phone)
  • Integrates with multiple systems (security systems, payment gateways, CRM systems, ERP systems, HR systems, etc.)
  • Involves data migration from an older system
  • Has complex business logic
  • Has complex reporting requirements
  • Involves a data warehouse or data mart

The following are a few other factors that can impact a software project timeline. Part of the job of a Project Manager is to monitor these types of risks so they can be identified early and mitigated to keep the project on track.

  • Change of requirements or design after the project has started
  • Delays when working with third -parties such as not receiving technical documentation, credentials to test systems, or support on technical questions
  • Missing requirements or unclear system design
  • Inconsistent direction from multiple stakeholders
  • Working with new technologies
  • Fixing bad data or missing data in a data migration

The Checklist For Sharing Your Software Vision

Before you get started in developing your software app, your thoughts and ideas should be clarified and written down so they can be consistently and easily shared and understood. We have created a checklist to help you get started on the right foot.

You can grab a copy of that checklist below and share it with your team!

Gain a competitive advantage in your industry with custom software development services from SOLTECH.


Thayer Tate

Chief Technology Officer

Software Development Timeline: How Long Does It Take To Build Custom Software? (8)Thayer is the Chief Technology Officer at SOLTECH, bringing over 20 years of experience in technology and consulting to his role. Throughout his career, Thayer has focused on successfully implementing and delivering projects of all sizes. He began his journey in the technology industry with renowned consulting firms like PricewaterhouseCoopers and IBM, where he gained valuable insights into handling complex challenges faced by large enterprises and developed detailed implementation methodologies.

Thayer’s expertise expanded as he obtained his Project Management Professional (PMP) certification and joined SOLTECH, an Atlanta-based technology firm specializing in custom software development, Technology Consulting and IT staffing. During his tenure at SOLTECH, Thayer honed his skills by managing the design and development of numerous projects, eventually assuming executive responsibility for leading the technical direction of SOLTECH’s software solutions.

As a thought leader and industry expert, Thayer writes articles on technology strategy and planning, software development, project implementation, and technology integration. Thayer’s aim is to empower readers with practical insights and actionable advice based on his extensive experience.

Software Development Timeline: How Long Does It Take To Build Custom Software? (2024)

FAQs

Software Development Timeline: How Long Does It Take To Build Custom Software? ›

On average, we see a software development timeline of 4-9 months. The size and complexity of the project are the biggest factors in its overall duration. A project is considered large or has a greater complexity if any of the following apply: Involves 25+ screens.

How long does it take to build custom software? ›

Typically, custom software projects take 4-9 months from conception to completion of testing and release. In order to guarantee a well-designed and durable software solution is sustainable and extensible, careful engineering is required.

What is the timeline for custom software development? ›

Here is the answer to the software development timeline.
  • Small business software project timeline: 3 to 4 months.
  • Mid-level business software project timeline: 5 to 6 months.
  • Enterprise business software project timeline: 12 or more months.
Oct 17, 2023

How long does it take to implement a new software in a company? ›

Implementation time can vary widely; for some SaaS products, it can be a matter of days or weeks, while for complex enterprise solutions, it might span several months or even years. This metric is especially pertinent in B2B environments where time to value is critical.

How long does it take to write a software application? ›

How Long Does App Development Take?
App TypeEstimated time
Simple App Development2-4 months
Average App Development4-6 months
Complex App Development9+ months
Mar 14, 2024

How long does it take to build a custom computer? ›

With a few builds under your belt, you might be more familiar with the assembly process. Typically, building a PC might then take about 4 to 6 hours, provided there are no unexpected issues.

What is the average cost of custom software development? ›

Custom Software Development Pricing: The Short Answer

In our experience, most custom software development prices range from $100,000 to $400,000 depending on the size, for designing and developing the application and delivering it ready for use.

How long does it take to build a SaaS product? ›

So, how long does it take to build a saas product? That depends. It could take anywhere from 2 months to 10 months, and possibly longer, but for most SaaS MVPs, it shouldn't take longer than 6 months.

How to estimate software development time? ›

How to estimate the software development time?
  1. Define the scope of the project.
  2. Break down the project into tasks.
  3. Determine the resources required.
  4. Estimate the time required for each task.
  5. Identify the risks and contingencies.
  6. Craft a timeline.
  7. Monitor the progress.
Aug 30, 2023

How long does it take to build an ERP system? ›

When implementing an ERP, businesses should aim to get the project completed within 4 to 6 months, nothing longer. While it's true that ERP implementations are a massive project to take on, long implementation timelines only lead to ERP projects stalling and failing — leaving your business in worse shape than before.

How long does it take to build a program? ›

On average, we see a software development timeline of 4-9 months. The size and complexity of the project are the biggest factors in its overall duration. A project is considered large or has a greater complexity if any of the following apply: Involves 25+ screens.

How long does it take a developer to build an app? ›

To develop an Android app, you will typically need 1 to 3 months for simple apps, 3 to 6 months for apps of moderate complexity, and 6 months to a year or more for highly complex apps. App features, development approach, and team expertise significantly influence the timeline.

How long does it take to build an app like Uber? ›

Understanding Careem and Uber App Development Cost
Type of ApplicationCost EstimationTime Duration
Basic$40,000 to $60,0002-3 months
Intermediate$60,000 to $90,0003-6 months
Advanced$90,000 to $300,0009+ months
Jun 18, 2024

How long does it take to build an adobe? ›

The adobe brick walls of an average size home at around 2000 square feet (or 185 square meters) can be constructed within one month by a skilled 3-person team. A crew of 3 able bodies can produce around 600 bricks in a given 8-hour day. This same crew can lay approximately 250 bricks into a wall per day.

How long does it take to make a custom ROM? ›

Synchronizing the source repository can take hours (depending on your Internet connection speed). Also, a full clean build will take several hours to complete. Even after making a minor change, you might need to wait 10 to 20 minutes for a build. It all depends on your hardware.

How long does it take to develop a game software? ›

Most modern PC or console games take from three to five years to complete, where as a mobile game can be developed in a few months. The length of development is influenced by a number of factors, such as genre, scale, development platform and number of assets.

How much does custom software development cost per hour? ›

Large-Scale Custom Software Development Projects
Custom Software Development Cost By Project Size
Project TypeHourly Rate RangeTotal Cost Range
Small Projects$15 – $30 per hour$5,000 – $20,000
Mid-Sized Projects$40 – $75 per hour$25,000 – $60,000
Large-Scale Projects$80 – $125+ per hour$75,000 – $120,000
6 days ago

Top Articles
Differences: Online vs. Offline Crypto Wallets
Should You Pool Your Finances in a Romantic Relationship?
English Bulldog Puppies For Sale Under 1000 In Florida
Toyota Campers For Sale Craigslist
PRISMA Technik 7-10 Baden-Württemberg
Mama's Kitchen Waynesboro Tennessee
Craigslist Free Stuff Appleton Wisconsin
Jennette Mccurdy And Joe Tmz Photos
Moviesda Dubbed Tamil Movies
Wal-Mart 140 Supercenter Products
Best Pawn Shops Near Me
Why Is Stemtox So Expensive
Obituary | Shawn Alexander | Russell Funeral Home, Inc.
Skylar Vox Bra Size
Readyset Ochsner.org
Meritas Health Patient Portal
iLuv Aud Click: Tragbarer Wi-Fi-Lautsprecher für Amazons Alexa - Portable Echo Alternative
Log in or sign up to view
Wicked Local Plymouth Police Log 2022
Richland Ecampus
Keurig Refillable Pods Walmart
Pokemon Unbound Shiny Stone Location
The BEST Soft and Chewy Sugar Cookie Recipe
Low Tide In Twilight Ch 52
Defending The Broken Isles
Netwerk van %naam%, analyse van %nb_relaties% relaties
Violent Night Showtimes Near Johnstown Movieplex
Divide Fusion Stretch Hoodie Daunenjacke für Herren | oliv
Emuaid Max First Aid Ointment 2 Ounce Fake Review Analysis
Kempsville Recreation Center Pool Schedule
Slv Fed Routing Number
Gerber Federal Credit
Hannibal Mo Craigslist Pets
Gets Less Antsy Crossword Clue
Evil Dead Rise (2023) | Film, Trailer, Kritik
Aurora Il Back Pages
Сталь aisi 310s российский аналог
Download Diablo 2 From Blizzard
The Largest Banks - ​​How to Transfer Money With Only Card Number and CVV (2024)
Pa Legion Baseball
Charli D'amelio Bj
Lucifer Morningstar Wiki
Citroen | Skąd pobrać program do lexia diagbox?
About Us
Xre 00251
855-539-4712
Gander Mountain Mastercard Login
Meee Ruh
Every Type of Sentinel in the Marvel Universe
Prologistix Ein Number
Metra Union Pacific West Schedule
Shad Base Elevator
Latest Posts
Article information

Author: Saturnina Altenwerth DVM

Last Updated:

Views: 5740

Rating: 4.3 / 5 (44 voted)

Reviews: 83% of readers found this page helpful

Author information

Name: Saturnina Altenwerth DVM

Birthday: 1992-08-21

Address: Apt. 237 662 Haag Mills, East Verenaport, MO 57071-5493

Phone: +331850833384

Job: District Real-Estate Architect

Hobby: Skateboarding, Taxidermy, Air sports, Painting, Knife making, Letterboxing, Inline skating

Introduction: My name is Saturnina Altenwerth DVM, I am a witty, perfect, combative, beautiful, determined, fancy, determined person who loves writing and wants to share my knowledge and understanding with you.