MANDT | Client | MANDT | T000 | CLNT | | 3 | 0 | |
PSPNR | WBS Element | PS_POSNR | | NUMC | | 8 | 0 | |
POSID | Work Breakdown Structure Element (WBS Element) | PS_POSID | | CHAR | | 24 | 0 | |
POST1 | PS: Short description (1st text line) | PS_POST1 | | CHAR | | 40 | 0 | |
OBJNR | Object number | J_OBJNR | ONR00 | CHAR | | 22 | 0 | |
PSPHI | Current number of the appropriate project | PS_PSPHI | PROJ | NUMC | | 8 | 0 | |
POSKI | WBS element short identification | PS_POSKI | | CHAR | | 16 | 0 | |
ERNAM | Name of Person who Created the Object | ERNAM | | CHAR | | 12 | 0 | |
ERDAT | Date on Which Record Was Created | ERDAT | | DATS | | 8 | 0 | |
AENAM | Name of Person Who Changed Object | AENAM | | CHAR | | 12 | 0 | |
AEDAT | Date on which object was last changed | UPDAT | | DATS | | 8 | 0 | |
VERNR | Number of the responsible person (project manager) | PS_VERNR | TCJ04 | NUMC | | 8 | 0 | |
VERNA | Name of responsible person (Project manager) | PS_VERNA | | CHAR | | 25 | 0 | |
ASTNR | Applicant number | PS_ASTNR | TCJ05 | NUMC | | 8 | 0 | |
ASTNA | Applicant | PS_ASTNA | | CHAR | | 25 | 0 | |
PBUKR | Company code for WBS element | PS_PBUKR | T001 | CHAR | | 4 | 0 | |
PGSBR | Business area for WBS element | PS_PGSBR | TGSB | CHAR | | 4 | 0 | |
PKOKR | Controlling area for WBS element | PS_PKOKR | TKA01 | CHAR | | 4 | 0 | |
PRCTR | Profit Center | PRCTR | CEPC | CHAR | | 10 | 0 | |
PRART | Project type | PS_PRART | TCJ1 | CHAR | | 2 | 0 | |
STUFE | Level in Project Hierarchy | PS_STUFE | | INT1 | | 3 | 0 | |
PLAKZ | Indicator: Planning element | PS_PLAKZ | | CHAR | | 1 | 0 | Possible values |
BELKZ | Indicator: Account assignment element | PS_BELKZ | | CHAR | | 1 | 0 | Possible values |
FAKKZ | Indicator: Billing element | PS_FAKKZ | | CHAR | | 1 | 0 | Possible values |
NPFAZ | Relationship of network activity to production order | PS_NPFAR | | CHAR | | 1 | 0 | Possible values |
ZUORD | Network assignment | PS_ZUORD | | NUMC | | 1 | 0 | Possible values 1 | For project definition | 2 | For WBS element |
|
TRMEQ | Indicator: WBS dates detailed by activity dates | PS_TRMEQ | | CHAR | | 1 | 0 | Possible values |
KVEWE | Usage of the condition table | KVEWE | T681V | CHAR | | 1 | 0 | |
KAPPL | Application | KAPPL | T681A | CHAR | | 2 | 0 | |
KALSM | Costing Sheet | AUFKALSM | T683 | CHAR | | 6 | 0 | |
ZSCHL | Overhead key | AUFZSCHL | TKZSL | CHAR | | 6 | 0 | |
ABGSL | Results Analysis Key | ABGR_SCHL | TKKAA | CHAR | | 6 | 0 | |
AKOKR | Controlling area of requesting cost center | PS_AKOKR | TKA01 | CHAR | | 4 | 0 | |
AKSTL | Requesting cost center | PS_AKSTL | CSKS | CHAR | | 10 | 0 | |
FKOKR | Controlling area of responsible cost center | PS_FKOKR | TKA01 | CHAR | | 4 | 0 | |
FKSTL | Responsible cost center | PS_FKSTL | CSKS | CHAR | | 10 | 0 | |
FABKL | Factory calendar key | FABKL | TFACD | CHAR | | 2 | 0 | |
PSPRI | Priority | NW_PRIO | TCN07 | CHAR | | 1 | 0 | |
EQUNR | Equipment Number | EQUNR | EQUI | CHAR | | 18 | 0 | |
TPLNR | Functional Location | TPLNR | IFLOT | CHAR | | 30 | 0 | |
PWPOS | WBS element currency | PS_PWPOS | TCURC | CUKY | | 5 | 0 | |
WERKS | Plant | WERKS_D | T001W | CHAR | | 4 | 0 | |
TXTSP | Language Key | SPRAS | T002 | LANG | | 1 | 0 | |
SLWID | Key word ID for user-defined fields | SLWID | TCN00 | CHAR | | 7 | 0 | |
USR00 | 1st user field for 20 characters - WBS element- | USR00PRPS | | CHAR | | 20 | 0 | |
USR01 | 2nd user field 20 digits - WBS element | USR01PRPS | | CHAR | | 20 | 0 | |
USR02 | 3rd user-defined field 10 digits -WBS element | USR02PRPS | | CHAR | | 10 | 0 | |
USR03 | 4th user-defined field 10 digits -WBS element | USR03PRPS | | CHAR | | 10 | 0 | |
USR04 | 1st user-defined field for quantity(length 10,3) WBS element | USR04PRPS | | QUAN | | 13 | 3 | |
USE04 | 1st user defined field for quantity field unit - WBS element | USE04PRPS | T006 | UNIT | | 3 | 0 | |
USR05 | 2nd use field for quantity (length 10,3) WBS element | USR05PRPS | | QUAN | | 13 | 3 | |
USE05 | 2nd user defined field for quantity field unit - WBS element | USE05PRPS | T006 | UNIT | | 3 | 0 | |
USR06 | 1st user field for values (length 10,3) WBS element | USR06PRPS | | CURR | | 13 | 3 | |
USE06 | 1st user defined field for value field unit - WBS element | USE06PRPS | TCURC | CUKY | | 5 | 0 | |
USR07 | 2nd user field for values (length 10,3) -WBS element | USR07PRPS | | CURR | | 13 | 3 | |
USE07 | 2nd user defined field for value field unit - WBS element | USE07PRPS | TCURC | CUKY | | 5 | 0 | |
USR08 | 1st user field for date -WBS element | USR08PRPS | | DATS | | 8 | 0 | |
USR09 | 2nd user field for date -WBS element | USR09PRPS | | DATS | | 8 | 0 | |
USR10 | 1st user field for 'Ind. for evaluations' WBS elem. | USR10PRPS | | CHAR | | 1 | 0 | Possible values X | Flag set. Event has occurred. | NULL | Flag is Not Set |
|
USR11 | 2nd user field for 'Indicator for eval.s' WBS elemnt | USR11PRPS | | CHAR | | 1 | 0 | Possible values X | Flag set. Event has occurred. | NULL | Flag is Not Set |
|
KOSTL | Cost center to which costs are actually posted | PS_KOSTL | CSKS | CHAR | | 10 | 0 | |
KTRG | Cost Object | KSTRG | CKPH | CHAR | | 12 | 0 | |
BERST | Authorization key for project master data | PS_BERST | | CHAR | | 16 | 0 | |
BERTR | Authorization key for project dates (WBS) | PS_BERTR | | CHAR | | 16 | 0 | |
BERKO | Authorization key for costs and revenues | PS_BERKO | | CHAR | | 16 | 0 | |
BERBU | Authorization key for project budget | PS_BERBU | | CHAR | | 16 | 0 | |
CLASF | Indicator: WBS element used in project summarization | PS_CLASF | | CHAR | | 1 | 0 | Possible values |
SPSNR | Std WBS: Internal project item number (w/exit on ID) | PS_SPSNR | PRPSS | NUMC | | 8 | 0 | |
SCOPE | Object Class | SCOPE_CV | | CHAR | | 2 | 0 | Possible values OC | Overhead costs | IV | Investment | PR | Production | PA | Profit analysis |
|
XSTAT | Statistical WBS element | PS_XSTAT | | CHAR | | 1 | 0 | Possible values |
TXJCD | Tax Jurisdiction | TXJCD | TTXJ | CHAR | | 15 | 0 | |
ZSCHM | Interest Profile for Project/Order Interest Calculation | PS_ZSCHM | TPI01 | CHAR | | 7 | 0 | |
IMPRF | Investment measure profile | IM_PROFIL | TAPRF | CHAR | | 6 | 0 | |
EVGEW | Aggregation weight for POC (PS progress) | EV_WEIGHTD | | DEC | | 8 | 0 | |
AENNR | Change Number | AENNR | AENR | CHAR | | 12 | 0 | |
SUBPR | Sub-project in work breakdown structure | PS_SUBPR | PRTP | CHAR | | 12 | 0 | |
POSTU | PS: Short description (1st text line) in all caps | PS_POSTU | | CHAR | | 40 | 0 | |
PLINT | Indicator for Integrated Planning | PLINT | | CHAR | | 1 | 0 | Possible values |
LOEVM | Deletion Indicator | LOEVM | | CHAR | | 1 | 0 | Possible values |
KZBWS | Valuation of Special Stock | KZBWS | | CHAR | | 1 | 0 | Possible values NULL | No stock valuation | M | Separate valuation with ref. to sales document/project | A | Valuation without reference to sales document |
|
FPLNR | Billing plan number / invoicing plan number | FPLNR | | CHAR | | 10 | 0 | |
TADAT | Technically complete date | TABGDAT | | DATS | | 8 | 0 | |
IZWEK | Reason for investment | IZWEK | T087I | CHAR | | 2 | 0 | |
ISIZE | Scale of investment objects | IM_SIZECL | TAIF5 | CHAR | | 2 | 0 | |
IUMKZ | Reason for environmental investment | AM_UMWKZ | T087K | CHAR | | 5 | 0 | |
ABUKR | Requesting company code | IM_ABUKRS | T001 | CHAR | | 4 | 0 | |
GRPKZ | Indicator: Grouping WBS element | GRPSPKZ | | CHAR | | 1 | 0 | Possible values NULL | Not a grouping WBS element | 1 | Grouping WBS element for all materials | 2 | Grouping WBS element for selected MRP groups |
|
PGPRF | Distribution profile | PGPROFID | TPGPRF | CHAR | | 6 | 0 | |
LOGSYSTEM | Logical System | LOGSYSTEM | | CHAR | | 10 | 0 | |
PSPNR_LOGS | Numeric field length 8 | NUM08 | | NUMC | | 8 | 0 | |
STORT | Location | PS_STORT | T499S | CHAR | | 10 | 0 | |
FUNC_AREA | Functional Area | FKBER | TFKB | CHAR | | 16 | 0 | |
KLVAR | Costing Variant | CK_KLVAR | | CHAR | | 4 | 0 | |
KALNR | Cost Estimate Number for Cost Est. w/o Qty Structure | CK_KALNR | | NUMC | | 12 | 0 | |
POSID_EDIT | Work Breakdown Structure Element (WBS Element) Edited | PS_POSID_EDIT | | CHAR | | 24 | 0 | |
PSPKZ | Indicator: WBS element for production lot | PL_PSPKZ | | CHAR | | 1 | 0 | Possible values |
MATNR | Material Number | MATNR | | CHAR | | 18 | 0 | |
VLPSP | WBS: Reference work breakdown structure element | PL_PSP_PNR | | NUMC | | 8 | 0 | |
VLPKZ | Indicator: Reference WBS element for production lot | PL_VLPKZ | | CHAR | | 1 | 0 | Possible values |
SORT1 | Sort string 1 for production lot | PL_SORT1 | | CHAR | | 10 | 0 | |
SORT2 | Sort string 2 for production lot | PL_SORT2 | | CHAR | | 10 | 0 | |
SORT3 | Sort string 3 for production lot | PL_SORT3 | | CHAR | | 10 | 0 | |
VNAME | Joint Venture | JV_NAME | T8JV | CHAR | | 6 | 0 | |
RECID | Recovery Indicator | JV_RECIND | T8JJ | CHAR | | 2 | 0 | |
ETYPE | Equity type | JV_ETYPE | T8JE | CHAR | | 3 | 0 | |
OTYPE | Joint Venture Object Type | JV_OTYPE | | CHAR | | 4 | 0 | |
JIBCL | JIB/JIBE Class | JV_JIBCL | T8J6A | CHAR | | 3 | 0 | |
JIBSA | JIB/JIBE Subclass A | JV_JIBSA | T8J6C | CHAR | | 5 | 0 | |
CGPL_GUID16 | Generic project planning: GUID from external R/3 system | CGPL_GUID16_R3 | | RAW | | 16 | 0 | |
CGPL_LOGSYS | Generic project planning: Log. system for CGPL_GUID16_R3 | CGPL_LOGSYS | | CHAR | | 10 | 0 | |
CGPL_OBJTYPE | Generic project planning: object type from ext. R/3 system | CGPL_OBJECT_TYPE_R3 | | CHAR | | 3 | 0 | |
ADPSP | Reference Element PM/PS | ADDCOMPARE_CORE | | CHAR | | 40 | 0 | |
RFIPPNT | Reference Point for Relationship Between iPPE and PS | CN_RPIP | TCNRPIP | CHAR | | 20 | 0 | |
CPD_UPDAT | Time Stamp | /CPD/PFP_TSTMP | | DEC | | 15 | 0 | |
FERC_IND | Regulatory indicator | FE_IND | FERC_C7 | CHAR | | 4 | 0 | |
PRPS_STATUS | Status Combination | ACTCMB_DELE | ACTCMB_TAB | INT1 | | 3 | 0 | |