NRC seeks comments on new fee schedule for FY 2024 (2024)

NRC seeks comments on new fee schedule for FY 2024 (1)

A message from Goodway Technologies

Protecting Equipment Longevity and Performance

Learn More

The Nuclear Regulatory Commission is asking for feedback on proposed changes to the annual, licensing, inspection, and special projects fees for fiscal year 2024.

The proposed fee rule, published February 20 in the Federal Register, is based on the FY 2024 Congressional Budget Justification as a full-year appropriation, but it has not yet been enacted. The final rule will be based on the NRC’s actual appropriation, and the agency will update the final fee schedule as appropriate.

Detailed instructions on how to submit written comments are found on the Federal Register website, and comments will be accepted through March 21.

Why the changes? Under the Nuclear Energy Innovation and Modernization Act (NEIMA), enacted in January 2019, the NRC is required to recover nearly its full budget beginning with FY 2024—which for the federal government runs from October 2023 through September 2024.

The bipartisan bill aims to make the NRC’s fee collection more transparent and predictable. It caps NRC fees (adjusted for inflation) for existing reactors and requires the NRC to improve the efficiency of uranium recovering licensing.

It also directs the NRC to establish advanced reactor licensing framework by 2027, a move lauded by many nuclear supporters who want to see more urgency in bringing next-generation nuclear plants on line. Under the bill, the NRC must establish performance metrics and report to Congress to improve transparency and streamline its decision-making process.

By the numbers: After accounting for the exclusions from the fee recovery requirement and net billing adjustments, the NRC must generate approximately $825.7 million in fees in FY 2024, according to an agency news release.

The NRC’s proposed FY 2024 budget is approximately $1.01 billion. The agency is looking to use $27.1 million in carryover funds, which leaves it responsible for recovering $979.2 million in fees. This amount is an increase of $52.1 million from FY 2023.

Of this amount, the NRC estimates that the following:

Other changes are listed below:

  • Compared with FY 2023, the proposed annual fees would decrease for the operating power reactors fee class. This fee does not exceed the cap established by NEIMA legislation.
  • Proposed annual fees would increase for fuel facilities, spent fuel storage/reactor decommissioning activities, nonpower production or utilization facilities, transportation activities for the U.S. Department of Energy, the non-DOE uranium recovery licensee, the Uranium Mill Tailings Radiation Control Act Program, and all materials users fee categories.
  • Licensees and applicants would face a higher hourly rate for services—increased from $300 to $321—and license application fees would be adjusted accordingly.
  • The NRC’s payment methods would be amended to align with the U.S. Department of the Treasury’s “no-cash no-check” policy to remove paper forms of payment and provide that payments be made electronically using the methods accepted at pay.gov.
NRC seeks comments on new fee schedule for FY 2024 (2024)
Top Articles
Can I Charge Interest on Late Payments?
Know Your Claim Forms: UB-04 and CMS-1500 - AMPM Billing
Barstool Sports Gif
Average Jonas Wife
Bj 사슴이 분수
123 Movies Black Adam
Live Basketball Scores Flashscore
CLI Book 3: Cisco Secure Firewall ASA VPN CLI Configuration Guide, 9.22 - General VPN Parameters [Cisco Secure Firewall ASA]
Triumph Speed Twin 2025 e Speed Twin RS, nelle concessionarie da gennaio 2025 - News - Moto.it
Chelsea player who left on a free is now worth more than Palmer & Caicedo
OSRS Fishing Training Guide: Quick Methods To Reach Level 99 - Rune Fanatics
Nikki Catsouras Head Cut In Half
Craigslist Cars And Trucks Buffalo Ny
Hardly Antonyms
Globe Position Fault Litter Robot
Jet Ski Rental Conneaut Lake Pa
Pwc Transparency Report
Crusader Kings 3 Workshop
Top Hat Trailer Wiring Diagram
Bjork & Zhulkie Funeral Home Obituaries
House Party 2023 Showtimes Near Marcus North Shore Cinema
A rough Sunday for some of the NFL's best teams in 2023 led to the three biggest upsets: Analysis - NFL
How do I get into solitude sewers Restoring Order? - Gamers Wiki
Vipleaguenba
Unity - Manual: Scene view navigation
Wausau Marketplace
Dallas Craigslist Org Dallas
Espn Horse Racing Results
Xfinity Outage Map Fredericksburg Va
Hannaford Weekly Flyer Manchester Nh
Victory for Belron® company Carglass® Germany and ATU as European Court of Justice defends a fair and level playing field in the automotive aftermarket
Rugged Gentleman Barber Shop Martinsburg Wv
Does Circle K Sell Elf Bars
Melissa N. Comics
123Moviestvme
Mega Millions Lottery - Winning Numbers & Results
Exploring TrippleThePotatoes: A Popular Game - Unblocked Hub
Free Robux Without Downloading Apps
THE 10 BEST Yoga Retreats in Konstanz for September 2024
Tal 3L Zeus Replacement Lid
Bimmerpost version for Porsche forum?
How to Draw a Sailboat: 7 Steps (with Pictures) - wikiHow
Directions To Advance Auto
Brandon Spikes Career Earnings
boston furniture "patio" - craigslist
Zom 100 Mbti
Euro area international trade in goods surplus €21.2 bn
Walmart Listings Near Me
Enter The Gungeon Gunther
German American Bank Owenton Ky
Pauline Frommer's Paris 2007 (Pauline Frommer Guides) - SILO.PUB
Dinargurus
Latest Posts
Article information

Author: Kerri Lueilwitz

Last Updated:

Views: 6569

Rating: 4.7 / 5 (67 voted)

Reviews: 82% of readers found this page helpful

Author information

Name: Kerri Lueilwitz

Birthday: 1992-10-31

Address: Suite 878 3699 Chantelle Roads, Colebury, NC 68599

Phone: +6111989609516

Job: Chief Farming Manager

Hobby: Mycology, Stone skipping, Dowsing, Whittling, Taxidermy, Sand art, Roller skating

Introduction: My name is Kerri Lueilwitz, I am a courageous, gentle, quaint, thankful, outstanding, brave, vast person who loves writing and wants to share my knowledge and understanding with you.