Models describe BSEE deepwater decommissioning cost estimates (2024)

Editor's note: This feature article first appeared in the January-February 2024 issue of Offshore magazine.Click here to view the full issue.

By Mark J. Kaiser, Louisiana State University

BSEE estimates platform decommissioning cost in the US Gulf of Mexico in water depth 122-250 meters at $4.8 million, about twice as expensive as removals in the 61-122 m water depth range. For platforms residing in 250-500 m water depth, cost estimates range from $10-80 million.

For pipeline decommissioning, a unit cost of approximately $1.6 million per pipeline segment is applied for bulk oil, bulk gas, lift, umbilical and water product classes, and $1.35 million per segment for oil and gas product classes. In part 3 of this article series, we examine decommissioning costs for fixed platforms and deepwater pipelines in the US Gulf of Mexico.

Decommissioning options

Shallow-water fixed platform decommissioning typically follows a complete removal procedure, removing the platform and scrapping the deck and jacket in a shipyard, or removing the deck and reefing the jacket in a designated reefing location.

In deepwater, fixed platforms and compliant towers are large heavy structures and all decommissioning options are evaluated for engineering and economic feasibility, including toppling-in-place. Most floaters will require complete removal but opportunities for reefing may be available.

A pipeline may be abandoned in place if it does not constitute a hazard to navigation, commercial fishing operations, or unduly interferes with other users.

Pipelines abandoned in place need to be flushed, filled with seawater, and plugged with the ends buried at least three feet below the mudline, typically under sand bags or concrete type mats.

Umbilical lines and flowlines are flushed and different vessel spreads are utilized depending on water depth, length and market conditions at the time of the operation, and unlike export pipelines, umbilicals and flowlines are expected to be completely removed from the seabed.

Fixed platforms: probabilistic cost estimates

From 2016-2021, eight fixed platforms, one compliant tower, two floaters, and several pipeline segments were decommissioned in the US Gulf of Mexico in water depth greater than 400 ft (122 m).

For fixed platforms in the ‘shallow’ deepwater (122-200 m water depth), BSEE estimated the decommissioning cost for 29 fixed platforms (FPs) using probabilistic methods. Total removal cost was reported at $149 million, or $5.1 million/FP.

All the structures reside within water depth <200 m and have estimated removal cost less than $8 million per structure. About half the structures are classified as major and manned.

Correlating FP removal cost with water depth yields a robust correspondence for these probabilistic estimates:

FP Cost (Probabilistic) = 32,402 WD

where FP removal cost is reported in dollars and water depth WD is in meters. Model fit R2 = 0.89. The probabilistic estimates represent median (P50) values.

The cost function for the probabilistic one-variable estimate is robust and significant. Regression models that employ bed count and/or well slots as a proxy for structure complexity and/or size splits out the cost between factors but does not otherwise improve the model fit.

Note that as new attributes are added to the model, the water depth coefficient decreases [from 32,402/m to 28,184/m (one attribute) to 20,932/m (two attributes)] since the elements enter as positive variables.

The cost functions depicted are expected to represent the cost data reported by operators with a reasonable degree of accuracy; the cost functions are also expected to reflect the cost estimation algorithms employed by BSEE.

Models describe BSEE deepwater decommissioning cost estimates (1)

Fixed platforms: deterministic cost estimates

There are 34 FPs and 2 compliant towers (CTs) in the deepwater Gulf of Mexico where deterministic estimates were performed at a total reported cost of $843 million, or $21.4 million/FP and $59 million/CT.

Most of the platforms reside in water depth between 200-500 m and have decommissioning cost that range from $10 million up to $80 million (Figure 1).

Deterministic costs are performed when operator-reported cost data is not adequate to perform a reliable statistical assessment. In such cases, work decomposition methods or a simple average/median cost estimate are applied.

Work decomposition methods are a formal hypothetical approach performed by breaking down operations into several tasks and then estimating the time and cost of each task to arrive at an estimate.

Work decomposition methods are similar to AFE (authorization for expenditure) estimates made by engineers for well drilling and related project development cost, and are a standard and accepted approach in industry, but when performed over a large and diverse collection of assets special care needs to be made in providing reliable assessments.

Excluding three data points from the sample because of their exceptional nature (for reasons described below), a water depth correspondence yields a robust relation with a slope coefficient about two-and-a-half times larger than the probabilistic relation:

FP Cost (Deterministic) = 85,141 WD,

where FP removal cost is reported in dollars and water depth WD in meters. Model fit R2 = 0.80.

Again, since bed count and well slots are positive variables, if these attributes are used in the model the water depth unit cost will necessarily decrease with each new attribute [from $85,141/m to $66,479/m (one attribute) to $48,591/m (two attributes)].

Three platforms with individual removal cost >$100 million each were excluded from the evaluation: Bullwinkle (23552) in GC65 in 429 m, Taylor Energy’s MC20 platform (23051) in 169 m, and McMoRan’s EW947 platform (23925) in 253 m water depth.

Operators for these structures probably acquired third-party decommissioning cost estimates or performed their own detailed engineering study because of unique circ*mstances. Bullwinkle is the largest fixed platform in the world and is estimated to cost $434 million for structure removal, while the MC20 platform and EW947 platform were both toppled by hurricanes (and currently lie on the seabed) with expected decommissioning cost of $125 million each.

For the MC20 platform, one or more wells have been leaking since the platform was toppled in 2008. In 2020, $42 million was spent to install a device to collect leaking oil at the site. At least a dozen wells still need to be plugged and the eventual fate of the downed structure is unknown since much of it is buried under mud and may simply not be amendable to lifting/removal without significant hazards. In 2021 Taylor Energy dissolved itself after forfeiting its $475 million bond for decommissioning.

The two compliant towers in the Gulf of Mexico, Baldpate (33039, 503 m) and Petronius (70012, 535 m), have an estimated decommissioning cost of $55 million and $62 million, respectively. Using these two data points, a water depth function like the FP cost formula results, but with greater unit cost:

CT Cost = 113,000 WD

where the CT removal cost is reported in dollars and water depth WD is in meters.

In 2020, ExxonMobil decommissioned its compliant tower Lena in 305 m water depth. Using the above cost function, Lena’s decommissioning cost would be estimated at about $34 million. Lena was toppled in place, and the operator donated $10.7 million to the Louisiana Artificial Reef Program, half of the estimated savings from complete removal. If BSEE did not include the operator donation in its assessment, the actual cost for Lena’s complete removal would have been either $45 million or $56 million depending on how the reefing savings were allocated.

Models describe BSEE deepwater decommissioning cost estimates (2)

Whether toppling in place is viable for the two remaining compliant towers and permitted by the government will determine future decommissioning costs.

Cost functions derived from deterministic estimates provide a descriptive means to better understand BSEE procedures and compare unit cost by structure class. However, unlike the probabilistic fixed platform (<200 m) cost functions derived above, which are believed to reflect (or proxy) BSEE cost estimation models, the cost functions for fixed platforms in deeper water (>200 m) and floaters (to be discussed in Part 4) should not be interpreted as a proxy for BSEE cost models since such models were not employed by BSEE in cost estimation. They are simply a means to compare and describe the cost estimates along one dimension.

Pipeline decommissioning

All BSEE pipeline decommissioning cost estimates are reported in deterministic terms, probably an indication of the wide variation in reported data. This is not surprising considering the sparsity of pipeline decommissioning cost data, nature of operations, and the diversity of pipeline types.

Apparently, a unit cost approximately $1.6 million per pipeline segment is applied across bulk oil, bulk gas, lift, umbilical and water product classes, and about $1.35 million per segment is applied for oil and gas product classes.

The unit cost applied is likely determined by a simple aggregate average (or median) of operator cost data.

Models describe BSEE deepwater decommissioning cost estimates (3)

Pipeline segments are of various diameter and length, and on a footage basis, the values vary widely. The vast majority of pipeline decommissioning cost is reported as either $1.59, $1.75, or $1.90 million per segment, a variation of about 20%, and this is applied with somewhat lower values for oil and gas lines, and somewhat higher values for other classes, again likely derived by a simple average (or median) cost.

Reported pipeline decommissioning cost data may have been calibrated with work decomposition algorithms.

About the author:Mark J. Kaiser is a professor at the Center for Energy Studies, Louisiana State University, Baton Rouge, Louisiana.
Models describe BSEE deepwater decommissioning cost estimates (2024)

FAQs

Models describe BSEE deepwater decommissioning cost estimates? ›

BSEE estimates platform decommissioning cost in the US Gulf of Mexico in water depth 122-250 meters at $4.8 million, about twice as expensive as removals in the 61-122 m water depth range. For platforms residing in 250-500 m water depth, cost estimates range from $10-80 million.

How much does decommissioning cost? ›

The total estimated cost of decommissioning UKCS upstream oil and gas infrastructure fell by £1.5bn (2%) to £44.5bn in 2021 – contributing to a total cut of £15bn (25%) since 2017, when the NSTA introduced a baseline estimate of £59.7bn and set a target of reducing costs by 35% to £39bn by end-2022.

What is an example of a decommissioning cost? ›

The costs incurred in ceasing an operation or activity. An example might be the removal of an oil rig and the restoration of the seabed. Under Financial Reporting Standard 12, a provision should be made for decommissioning costs relating to damage already done, e.g. the damage caused by the installation of a rig.

Who pays for decommissioning? ›

Under the Petroleum Act UK asset owners, operators and their partners carry the cost burden.

How much money does it cost to decommission a nuclear power plant? ›

Although there are many factors that affect reactor decommissioning costs, generally costs range from $300 million to $400 million. Approximately 70 percent of licensees are authorized to accumulate decommissioning funds over the operating life of their plants.

What are the two types of decommissioning? ›

There are three basic decommissioning options: immediate dismantling, long term safe enclosure followed by dismantling, and entombment, which is also called on-site or in-situ disposal [IV-1, IV-2]. Entombment has generally been limited to small installations.

Is decommissioning capex or opex? ›

These are the Capital Cost (CAPEX), Operation and Maintenance Cost (OPEX), and Decommissioning Cost (DECOM) [18,39].

What is the provision for decommissioning costs? ›

Decommissioning provisions, often called 'asset retirement obligations' (ARO), are recognised as estimates of costs involved in dismantling a fixed asset, removing it, and restoring the site. Present obligation arises when a fixed asset is acquired, constructed, or in use.

How much does offshore decommissioning cost? ›

BSEE estimates platform decommissioning cost in the US Gulf of Mexico in water depth 122-250 meters at $4.8 million, about twice as expensive as removals in the 61-122 m water depth range. For platforms residing in 250-500 m water depth, cost estimates range from $10-80 million.

How much does it cost to decommission a battery storage system? ›

The estimated cost to decommission a 1-MWh NMC lithium-ion battery-based grid energy storage system is $91,500. The majority of costs are attributed to on-site dismantling and packaging (40%), transportation (30%), and recycling (30%).

How much does it cost to decommission a solar farm? ›

Decommissioning a solar site costs, on average, about $368,000/1-MW for a ground-mounted PV System. Choosing the right partners to guide the process and support you throughout the cleanup will help alleviate some of the headaches and costs.

How do you decommission a building? ›

Clearing vegetation surrounding the building. Removing hazardous, flammable and waste materials. Providing temporary support to weakened or damaged elements. Installing a security system.

Top Articles
Guidelines/Tips for Traveling with Cash
Biden signs a bill that could ban TikTok — after the 2024 election
Toa Guide Osrs
Www.paystubportal.com/7-11 Login
123 Movies Black Adam
Loves Employee Pay Stub
Belle Meade Barbershop | Uncle Classic Barbershop | Nashville Barbers
P2P4U Net Soccer
Tv Schedule Today No Cable
Housing Intranet Unt
Full Range 10 Bar Selection Box
The Rise of Breckie Hill: How She Became a Social Media Star | Entertainment
Washington Poe en Tilly Bradshaw 1 - Brandoffer, M.W. Craven | 9789024594917 | Boeken | bol
Enterprise Car Sales Jacksonville Used Cars
Procore Championship 2024 - PGA TOUR Golf Leaderboard | ESPN
Sound Of Freedom Showtimes Near Cinelux Almaden Cafe & Lounge
Hocus Pocus Showtimes Near Amstar Cinema 16 - Macon
Nhl Tankathon Mock Draft
Optum Urgent Care - Nutley Photos
Bellin Patient Portal
CVS Health’s MinuteClinic Introduces New Virtual Care Offering
Mynahealthcare Login
Dexter Gomovies
Evil Dead Rise Ending Explained
Striffler-Hamby Mortuary - Phenix City Obituaries
Shauna's Art Studio Laurel Mississippi
Delta Rastrear Vuelo
JD Power's top airlines in 2024, ranked - The Points Guy
67-72 Chevy Truck Parts Craigslist
The Legacy 3: The Tree of Might – Walkthrough
Reborn Rich Ep 12 Eng Sub
Troy Gamefarm Prices
Trivago Myrtle Beach Hotels
Cheetah Pitbull For Sale
Joey Gentile Lpsg
The Largest Banks - ​​How to Transfer Money With Only Card Number and CVV (2024)
Lucifer Morningstar Wiki
Pathfinder Wrath Of The Righteous Tiefling Traitor
Craigslist Minneapolis Com
Ups Authorized Shipping Provider Price Photos
White County
Alba Baptista Bikini, Ethnicity, Marriage, Wedding, Father, Shower, Nazi
Breaking down the Stafford trade
Lorton Transfer Station
Underground Weather Tropical
Who uses the Fandom Wiki anymore?
Every Type of Sentinel in the Marvel Universe
Santa Ana Immigration Court Webex
Image Mate Orange County
99 Fishing Guide
Immobiliare di Felice| Appartamento | Appartamento in vendita Porto San
Latest Posts
Article information

Author: Terrell Hackett

Last Updated:

Views: 6024

Rating: 4.1 / 5 (52 voted)

Reviews: 83% of readers found this page helpful

Author information

Name: Terrell Hackett

Birthday: 1992-03-17

Address: Suite 453 459 Gibson Squares, East Adriane, AK 71925-5692

Phone: +21811810803470

Job: Chief Representative

Hobby: Board games, Rock climbing, Ghost hunting, Origami, Kabaddi, Mushroom hunting, Gaming

Introduction: My name is Terrell Hackett, I am a gleaming, brainy, courageous, helpful, healthy, cooperative, graceful person who loves writing and wants to share my knowledge and understanding with you.