FAQs
Go to the Revisions tab. Here, select the sheets (a) you wish to apply a revision to and then select the revisions (b) to apply to the previously selected sheets. You can choose to override any existing revisions (c) . When you're ready, click Ok and sit back and relax while your sheets get populated with revisions.
How do you remove a revision from a revision schedule in Revit? ›
Select the checkbox to include the revision in the sheets that do not have it. Select the corresponding Shown in Revision Schedule checkbox for each revision that you want to include in the revision schedule. To remove a revision from the selected sheet, clear the checkbox. Click OK.
How do you export revisions in Revit? ›
Select the built-in link, “Revisions.” After reviewing the Properties, hit “o*k.” Hit “Export” to save the results to a new Excel file. Open that Excel file.
How to add issuance Revit? ›
To Issue a Revision
In the Revit project, click View tab > Sheet Composition panel > Sheet Issues/Revisions. Alternatively, click on the Sheet Issues/Revisions tool from the Additional Settings drop-down in the Manage tab.
Why can't I remove revision from sheet Revit? ›
If the Revision Sequence associated with the Revision element has been issued then the option to delete will be disabled. To delete, the Issued checkbox for the associated revision would need to be unchecked. For more information on this process see the following help topic: Issue a Revision.
How do you hide old revisions in Revit? ›
In a view, select one or more revision clouds, right-click, and click Hide in View Category.
How to adjust revision schedule in Revit? ›
Define the Height of the Revision Schedule
- Open the title block for editing.
- Modify the revision schedule properties, as follows: ...
- In the drawing area, select the revision schedule of the title block. ...
- Drag the blue dot up or down until the revision schedule is the desired height.
How do you control revision? ›
To ensure proper revision control: Maintain the product record (designs, BOMs, parts, assemblies, etc.) in a single, centralized system so that the latest revisions are always accessible to internal teams and external partners. Assign all documents, parts, and assemblies a unique part number and version level.
How do you consolidate revision? ›
Make a video. Another creative revision technique is to put together a revision video. Writing is not the only way to revise, so try engaging the creative parts of your brain to consolidate what you're learning into memory.
How do you create a revision cloud in Revit? ›
Click Annotate tab Detail panel (Revision Cloud). Revit enters sketch mode. On the Tools panel, click one of the draw tools. In the drawing area, place the cursor near the part of the view that has changed and draw the cloud to encompass the changed area.
In the project, click View tab Sheet Composition panel (Sheet Issues/Revisions). In the Sheet Issues/Revisions dialog, click the sequence number for the revision to merge with another.
How to Create a new revision sequence in Revit? ›
New Revision sequences can be created by adding a NEW value in the Id column within an Excel file that has been created from the Revit Sample Link Files with Ideate BIMLink called Revisions-Create-NEW.
What is the difference between issue number and revision number? ›
The revision number changes with every revision in the document. The Issue number may change at stages / frequency determined by the organization.
How to schedule revision cloud comments? ›
To create a revision cloud schedule:
- Click View tab Create panel Schedules drop-down Schedule/Quantities.
- In the New Schedule dialog do the following: ...
- In the Schedule Properties dialog, in the Fields tab, you can add parameters as schedule fields from the Revision Clouds, Revisions, Sheets, and Views categories.
How to manage revision clouds in Revit? ›
Modify a Revision Cloud
- Click Modify | Revision Clouds tab Mode panel (Edit Sketch). Revit enters sketch mode.
- Select segments of the revision cloud, and drag the endpoints to adjust its boundaries.
- Click Modify Revision Clouds > Edit Sketch tab Mode panel (Finish Edit Mode).
How do I change the revision sequence in Revit? ›
Change the Order of Revisions
- In the project, click View tab Sheet Composition panel (Sheet Issues/Revisions).
- In the Sheet Issues/Revisions dialog, click the sequence number for the revision to move.
- Under Row, click Move Up or Move Down. ...
- Click OK.