Kit Homes: Everything You Should Know - AVRAME Kit Homes (2024)


Akit home is a kind of building that is assembled on-site (like a traditional wooden frame building) but where all the parts of the structure have been pre-cut at a factory and they’ve been delivered in packages (usually flat-packs, to save on transport cost).

In most cases, kit homes can be customized as per customer’s wish (i.e. the sie of the rooms can be altered, windows can be moved, …).
Building with kit homes allows forflexibilitywhile maintaining the cost of building affordable and the entire process not to complex.

What you can expect from a kit home

A kit home can bring several benefits to your project. The most important are:

  1. Less time used on site.
    A house kit contains all the parts necessary to build the structure of the house. All parts are pre-cut at the factory and the kit comes with detailed assembly instructions.
    Compared to a traditional built (where parts are measured and cut on-site), using a kit shortens (by weeks) the time spent on the construction site for putting together the structure.
  2. Less waste.
    When building with traditional methods, carpenters cut wood beams on-site and they cut what they need when they need it. Consequently, there is no optimization of materials and a lot of wood goes to waste in the form of pieces that are too short to be used in the build.
    Home kits are cut in the factory using an automated saw. The machine knows in advance all the pieces it has to cut and optimizes the work so that there is the minimum possible amount of waste left.
  3. Less skilled workforce.
    Since the thinking is done at the factory, construction workers on-site do not need to be skilled carpenters.
    Putting together the structure is quite easy as the kit comes with IKEA-like detailed instructions.
  4. Sourcing materials and services locally.
    The kit contains most of the parts necessary for getting the building Weathertight. However, to save on transport costs, some materials are not included in the kit and they must be sourced locally (insulation for example).
    This allows buying those components at a better price, thus saving a considerable amount of money.
    Sourcing materials and services locally also allow getting competitive prices on interior finishing works and technical installations.

On the other hand, in order to get all these benefits, you need to invest inplanningbefore you order the kit.

Getting a very clear idea of what you want to build is critical to the success of your project.
This is why we always recommend creating yourvisionfirst.

What a kit home is NOT

When it comes to prefabricated wooden buildings, the internet does not paint a very clear picture.
In fact, there is a lot ofconfusiononline about terminology.

Manufacturers use terms like “modular”, “prefab”, “pre-cut” interchangeably and this is plain wrong and misleading.

A kit home is a building that has to be built entirely on-site and it comes in packages of pre-cut material.

Now, the building might have a modular architecture (based on some geometric pattern that repeats itself, like Avrame triangular structure) but this doesn’t make it a modular building.

In the prefab industry, a “modular” house is a building that comes on-site in ready-made boxes. The boxes are fully finished (even inside) and they just need to be installed on the ground and connected together.

Needless to say, this form of construction is faster but way more expensive (it saves time and it burns money).

Kit homes are nothing like that. The idea behind building with a kit is tosave money.
A kit home will require investing some of your time (either in the building works or in the planning) and it will repay in a more affordable construction process.

Of all the prefabricated techniques, kit homes are the most basic one and the one where you can save the most sinceyou can use your own timein various stages of the building and you can customize a lot of details to your own wish (even finish some parts later if you like).

What to pay attention to

Even if building with a kit it is relatively easy and “forgiving”, good thoughtful planning is always necessary.

There are a number of things that go wrong during construction that will cost you time and money and cause painful headaches.

Timing is very important.There are certain things that have to be done in a specific order and following a precise time schedule… otherwise your project might get stuck.

If you are serious about building, you should invest some time inlearningwhat could go wrong and which are the points that need more attention.

To help with that, we developed twoguides:

  • the100 Questions Guide.
    Are you sure you are asking the smart questions?
    Chances are there are things you are not even considering, things which can halt or delay your project (or break your budget) once you realize you did not take them into account.
    In the 100 Questions Guide, we collected over 100 questions you should get an answer to BEFORE you start your project.
    Each question comes with and guidance on who can help you to answer that.
    The guide is a 44 pages PDF and it is a paid product. You can find ithere.
  • theBudgeting Guide.
    When you get closer to building, you need to get your numbers straight.
    The Budgeting Guide is a tool that will help you to figure out the total cost of your project.
    It is composed of a professional spreadsheet and a 30 pages PDF guide. The guide expands on the concepts discussed in the 100 Questions Guide and explains how to use the spreadsheet.
    The Budgeting Guide is a paid product and you can find ithere.

How can you pull it off

You need to get a very clear idea of how the entireprocessworks.
Once you have a bird’s eye view on the process and all its components, you can start making decisions.

The supplier of your kit should be able to help you creating thishigh-level picturein your head (this is exactly why here at Avrame we have the guides described above).

The process is more or less the same whether you build an A-frame or another kit home. Therefore, the time and money you invest in your education prior to launching the construction project are never wasted.

We stress so much about following a process because we know that things can go out of control really fast if one does not do the homework. We can tell several stories of clients who did not follow the process and ended up aborting the construction.

Typical reasons are:

  • the municipality did not approve the construction while the client already placed the order (bad planning)
  • the bank did not finance the construction while the client already placed the order (bad planning)
  • the client did not allocate enough money to complete the entire house (bad budgeting)
  • the client found out there were costs he did not consider (bad budgeting)
  • the client built foundations that were not suitable for the house (bad execution)

Here at Avrame, we invested heavily to get a solid process and strive to help our customers to make their journey one step after the other, in the right order.

Kit homes alternatives

There are several alternatives to kit homes. At the end of the story, the decision comes to how much of your time you are willing to invest in the build and how much money you can afford to spend.

Here is a list of options (more expensive on top):

  • traditional on-site building, bricks & mortar
  • traditional on-site building, wooden
  • modular construction
  • prefabricated elements construction
  • prefabricated frames construction
  • pre-cut construction (like Avrame)

NOTE:evaluating all the options above can take a long time. One should get the feeling of what he doesn’t want to do and rule out that option from the list at the beginning of the evaluation process.

One alternative no one ever mentions is tobuy a house which is already on the market.

As a matter of fact, this is by far the biggest competitor of kit homes.
The reasons are simple:

  • a ready-made house (or apartment) needs no work and no planning
  • you can move in immediately
  • you have fewer risks
  • you don’t need permission to build (no architect, no paperwork)
  • the Bank has an easier time to finance an object that already exists
  • you don’t need to learn any process or any new skill


On the other hand, you will not get your dream home and you cannot say you built a house for your family.

Conclusions

Kit homes are a great way to build your dream home on a budget.
Building a kit home requires being and remaining in control of the construction process.

You do get to build what you want exactly and you do so at a reasonable price but:

  • you need to do some homework and understand how the entire process works.
  • you might need to learn a few new skills (project management or carpentry for example).

Keep in mind you will need to make several decisions and to account for many details.

The best way to cope with that is to invest time in learning BEFORE you commit to the construction project.

Kit Homes: Everything You Should Know - AVRAME Kit Homes (2024)

FAQs

How long does it take to build an avrame house? ›

SOLO houses can be completed in a matter of a few days. DUO houses can take up to a few weeks. For TRIO houses, the average building time is 8 weeks (for the smallest model). Even if you're going for the biggest house, the structure is super quick to build.

Is it cheaper to build a house with a kit? ›

The price of a kit home varies based on its size and layout, your location and the manufacturer. Compared to traditional homes, kit houses can be much cheaper to build. Many kit home manufacturers have business models that are similar to those of modular and manufactured homes.

How hard are kit homes to build? ›

Since the thinking is done at the factory, construction workers on-site do not need to be skilled carpenters. Putting together the structure is quite easy as the kit comes with IKEA-like detailed instructions. Sourcing materials and services locally.

What is the difference between a kit home and a modular home? ›

While kit homes may appear cheaper upfront, they require more work and time for assembly. Whereas modular homes are delivered (or built on your land) with electrical fittings, water connections, and everything else you need for everyday living, kit homes require the extra work and effort on the part of the homeowner.

How much does it cost to build an avrame trio 120? ›

These are the prices of the house kit for Trio 120, to be built in the US: Structural Kit: from $59,975. Exterior Kit: from $25,325. Interior Kit: from $29,625.

How much does it cost to build an A-frame kit house? ›

The cost to build an A-frame house is $100 to $300 per square foot or $100,000 to $300,000 on average for a 1,000 SF home. A-frame cabin costs depend on the size, materials, features, and whether you purchase a kit or build the house from scratch.

Is it cheaper to buy a house or get one built? ›

Overall, it's cheaper to build a home than to buy one in California, with 13 out of the 20 counties saving you money if you decide to build your house from scratch. Budget-wise, building is more favorable in Southern California whereas Central California caters best to those interested in buying.

How much is the cheapest modular home? ›

Average Total Cost Of A Modular Home By Type
Modular Home TypeLow-End CostHigh-End Cost
Tiny house$20,000$50,000
Cottage$50,000$150,000
Townhouse$45,000$133,000
Log home$25,000$250,000
1 more row
Sep 11, 2024

Is it cheaper to build a house if you do it yourself? ›

Average Cost to Build Your Own Home

Costs could run as low as $50 per square foot and as high as $200 per square foot, depending on how much labor you take on yourself. While the cost to build a house ranges from $100 to $300 per square foot, you could cut up to 60% of the costs by taking on all of the labor yourself.

What is the easiest house to build yourself? ›

Here are some of the least expensive types of homes that are easy to build.
  • Tiny Homes. Tiny homes have quickly grown in popularity as an affordable and sustainable way of homeownership. ...
  • Shipping Container Homes. ...
  • Ranch-Style Homes. ...
  • Prefabricated (Prefab) Homes. ...
  • Barndominiums.
May 22, 2024

What does a house kit include? ›

Kit homes in California typically comprise pre-manufactured wall panels, roof trusses, and floors. Once these have been assembled, the building project can be finished by adding siding, windows, doors, and other custom finishes.

What is the hardest stage in building a house? ›

Perhaps the most difficult part of the whole building process is waiting for something to happen. In the beginning of your homebuilding journey, you might not see much activity on your homesite. However, there is a lot of behind-the-scenes activities.

Is it cheaper to buy a house kit or build from scratch? ›

Save money: Since materials are ordered in bulk and delivered to a factory, building a kit home is generally more affordable than building a traditional home.

What is the disadvantage of modular homes? ›

Of course, modular houses have their downsides. These include less customization capabilities than stick-built homes. The cost of the land and construction of the home may be higher than some people can afford, land restrictions, and perceive quality issues. Modular homes may also have more a complicated loan process.

What is a panelized kit home? ›

What are Panelized Prefabricated Homes? A panelized house kit is a prefab home that typically includes a roof, wall panels, and floor systems that are all first assembled in a factory, then delivered to the construction site. When building a panelized house kit, the foundation is laid first.

How long does it take to build a house realistically? ›

General Time Estimates

The journey from the initial plan to a finished home varies considerably. On average, it takes about seven months to construct a house​​. However, the timeline extends when factoring in pre-construction stages like planning and obtaining permits, which often round up to a year-long commitment.

Are A-frame homes expensive to build? ›

Building an A-frame costs between $100 to $200 per square foot for labor and materials. Similar to the cost of building a tiny home, your square footage costs might run upwards of $300 per square foot or more. In fact, some kits run from $400 to $600 per square foot. “Costs are higher in cities like Los Angeles.

How long does it typically take to frame a house? ›

Framing typically takes about two weeks. Mechanical Rough-ins. With the help of various vendors, your house will now be fitted for plumbing, electrical wiring, mechanical elements and insulation that need to go within or beneath the surface of walls, ceilings, and floors. This process typically takes four weeks.

How long does it take to build a full house? ›

The average time to build a single-family home is seven months, according to the U.S. Census Bureau, but this can vary from as little as three months to well over a year, or even longer for particularly complex and large custom homes.

Top Articles
Contact Us
Stock Market Under Biden | U.S. Bank
Beacon Schnider
Craigslist Kennewick Pasco Richland
Tribune Seymour
Compare the Samsung Galaxy S24 - 256GB - Cobalt Violet vs Apple iPhone 16 Pro - 128GB - Desert Titanium | AT&T
Remnant Graveyard Elf
Craigslist Pets Sac
Los Angeles Craigs List
Mini Handy 2024: Die besten Mini Smartphones | Purdroid.de
Best Forensic Pathology Careers + Salary Outlook | HealthGrad
Pekin Soccer Tournament
3S Bivy Cover 2D Gen
Ms Rabbit 305
Msu 247 Football
Saritaprivate
Tinker Repo
Isaidup
Mj Nails Derby Ct
R. Kelly Net Worth 2024: The King Of R&B's Rise And Fall
The Listings Project New York
Weve Got You Surrounded Meme
Craigslist Alo
Aliciabibs
Colonial Executive Park - CRE Consultants
Jcp Meevo Com
Bolsa Feels Bad For Sancho's Loss.
Workshops - Canadian Dam Association (CDA-ACB)
55Th And Kedzie Elite Staffing
Pronóstico del tiempo de 10 días para San Josecito, Provincia de San José, Costa Rica - The Weather Channel | weather.com
Speechwire Login
What is Software Defined Networking (SDN)? - GeeksforGeeks
Little Einsteins Transcript
Darktide Terrifying Barrage
Missing 2023 Showtimes Near Grand Theatres - Bismarck
Frostbite Blaster
11 Pm Pst
4083519708
Metro By T Mobile Sign In
Midsouthshooters Supply
Craigslist Summersville West Virginia
Tirage Rapid Georgia
Bones And All Showtimes Near Johnstown Movieplex
Blackwolf Run Pro Shop
COVID-19/Coronavirus Assistance Programs | FindHelp.org
Gon Deer Forum
Best Suv In 2010
Mail2World Sign Up
Ciara Rose Scalia-Hirschman
Subdomain Finer
Latest Posts
Article information

Author: Rev. Porsche Oberbrunner

Last Updated:

Views: 6411

Rating: 4.2 / 5 (53 voted)

Reviews: 92% of readers found this page helpful

Author information

Name: Rev. Porsche Oberbrunner

Birthday: 1994-06-25

Address: Suite 153 582 Lubowitz Walks, Port Alfredoborough, IN 72879-2838

Phone: +128413562823324

Job: IT Strategist

Hobby: Video gaming, Basketball, Web surfing, Book restoration, Jogging, Shooting, Fishing

Introduction: My name is Rev. Porsche Oberbrunner, I am a zany, graceful, talented, witty, determined, shiny, enchanting person who loves writing and wants to share my knowledge and understanding with you.