How to Calculate an Interest Reserve for a Construction Loan (2024)

There’s no doubt about it, construction lending is tough. From changing interest rates, long lead times, and freak weather events, there are a myriad of risks that can derail a project. However, from a lender’s perspective, there’s one risk that is top of mind when making a construction loan – the borrower’s ability to make their loan payments during the construction term.

To protect themselves, lenders require that an interest reserve fund be established prior to the start of construction and that it be seeded with enough money to make payments for the entirety of the construction period. With several variables to consider, some of which can be unpredictable, calculating how much money to deposit in the interest reserve fund can be a tricky task.

Interest Reserve Definition

The interest reserve is a capital account, established by the lender, for the purpose of funding a loan’s interest payments during the construction term. Logistically speaking, it’s a checking account where a predetermined amount of money is deposited as part of the first construction draw. Each month, the lender will debit the checking account for the interest payment.

In establishing the interest reserve fund, the biggest risk is that it’ll be depleted before the project is finished. As such, it’s critically important that the interest reserve calculation be accurate. But, because it’s created at the beginning of the construction period and the input variables can be unpredictable, it’s harder than it seems. Things like permitting delays, mistakes, bad weather, or community opposition, can throw a wrench into the best of estimates.

How to Calculate the Interest Reserve

The interest reserve calculation itself is fairly simple, but estimating the needed variables requires precision and experience. The required inputs are:

  1. Loan amount: Usually, construction loans are closed-end lines of credit and the loan “amount” represents the borrowing limit on the line of credit.
  2. Average Percentage Outstanding: Because the loan is disbursed piecemeal over time, it’s necessary to estimate the average percentage outstanding over the construction term. To do so, it’s not necessary to know the exact draw schedule, but it’s good to have a general idea of how much will be disbursed and when. Generally speaking, an estimate of 50% outstanding is safe. But, it may be necessary to adjust it up or down based on whether disbursem*nts are front loaded or back end loaded.
  3. Loan Interest Rate: If the rate on the construction loan is fixed, then this input is equivalent to the interest rate. However, in many cases, the interest rate is variable and can change over the term so an estimate of the average rate over the term is required. It’s a best practice to err on the high side when estimating.
  4. Construction Term: This is defined as the period of time from the Notice of Commencement to the Certificate of Occupancy and it’s the trickiest input to estimate. Even the best laid plans encounter unforeseen delays and construction projects alwaystake longer than expected. As a best practice, it’s wise to add a buffer to the term quoted by the contractor.
  5. Borrower Equity Contribution: The total cost of construction is covered by a combination of the loan amount and the Borrower’s equity contribution. In most cases, the lender will require that borrower equity be injected first to demonstrate commitment to the project. Once equity funds are exhausted, loan funds will be disbursed so it’s an important factor to consider in the average outstanding balance calculation.
  6. Construction Uses: This is a high level aggregation of the construction budget and it’s used to estimate the draw schedule. For example, the land purchase amount is usually advanced as part of the first draw so it’s a good indication of whether the draws are front or back end loaded.

The goal of the interest reserve calculation is to estimate the timing and amount of the construction draws and to calculate the resulting interest payment for each month. Because it can be cumbersome to perform this calculation, we’ve created an Interest Reserve Calculator as part of this article and it’ll perform the calculation for you. Enter your email address below to get it sent to your inbox:

Interest Reserve Caclulator

Fill out the quick form below and we’ll email you our free interest reserve calculator. You can use our interest reserve calculator to quickly estimate the interest reserve for a construction loan.

To illustrate the interest reserve calculation, let’s go through an example using the Interest Reserve Calculator. The scenario is below:

How to Calculate an Interest Reserve for a Construction Loan (1)

Using the scenario above, let’s discuss how it translates into the required input variables for the Interest Reserve Calculator:

Loan Amount: Per the scenario, the loan amount is $1,500,000 and it’s a direct input into the calculator.

Loan Interest Rate: Again, per the scenario, the interest rate is fixed at 4.00% for the construction term and it is a direct input into the calculator.

Construction Term: Per the scenario, the construction term is 6 months, but the calculator input requires the anticipated start and end dates. It’ll calculate the resulting term.

Borrower Equity Contribution: The Borrower Equity Contribution is $500,000, which is a direct input into the calculator. It can also be imputed by subtracting the total project cost from the loan amount.

Average % Outstanding: This is the most critical input in the calculation and it’s an estimate based on experience and a general idea of the draw schedule. 50% is a good place to start and it’s what we’ll use in the example, but it may need to be adjusted based on knowledge of the draw schedule. If the loan draws are front loaded, it may be higher than 50% or if they’re back-end loaded, it may be lower than 50%.

Construction Uses: The total construction uses is $2,000,000, which should equal the loan amount plus Borrower Equity. It should also be divided into a few high level line items to allow for a broad estimation of the draw schedule.

Once the variables are identified and plugged into the calculator, it should look like the screenshot below:

How to Calculate an Interest Reserve for a Construction Loan (2)

With the inputs complete, the tool will perform the following calculation to estimate the interest reserve.

Step 1: Multiply the loan amount by the Avg. % Outstanding to calculate the average loan balance for the entirety of the construction term: $1,500,000 * 50% = $750,000.

Step 2: Multiply the average outstanding balance by the interest rate to get annual interest paid: $750,000 * 4% = $30,000

Step 3: Divide the annual interest by 12 to get the average monthly interest payment: $30,000/12 = $2,500.

Step 4: Multiply the monthly interest by the number of months in the construction term: $2,500 * 6 = $15,000.

In the Interest Reserve Calculator Excel spreadsheet, the result is shown under the “Outputs” heading and looks like this:

How to Calculate an Interest Reserve for a Construction Loan (3)

It’s important to note that the tool is used for an estimate only. As a best practice, it’s a good idea to err on the high side or round up to ensure that there is enough money in the interest reserve to make payments for the entire construction term and account for potential delays. So, an analyst may add some contingency into the Interest Reserve estimate and end up at $17,500 or $18,000.

What Happens When Interest Reserve Runs Out?

Despite the care put into calculating the interest reserve requirement, there are occasions where the account runs dry before construction completion. On such occasions, one of three things is likely to happen:

  1. Line Item Reallocation: If available, funds will be reallocated from another line item in the construction budget. This is the best case scenario and a relatively benign situation.
  2. New Loan or Loan Increase: If there aren’t any funds available from other line items, the next best option is for the lender to either make an additional, smaller, loan to fund interest through construction completion or to increase the limit on the existing loan for the same purpose. This option can be tricky and raises the risk profile of the project. But, often there isn’t much of a choice because the only avenue for repayment is for construction to be completed.
  3. Borrower Pays Out of Pocket: If the lender refuses option two, the last option is for the borrower to make the interest payments out of their own pocket. If it comes to this, the borrower may not have a choice either because the borrower’s avenue to recovering their investment also requires that the project be completed.

Again, it’s a good idea to err on the high side or add a contingency to the interest reserve estimate to account for potential delays. Doing so will go a long way towards ensuring that the interest reserve doesn’t run out.

Conclusion

Because construction lending can be risky for all parties, one of the safeguards implemented by the lender is the implementation of an interest reserve fund at the outset of the construction period. The interest reserve fund is used to make the interest payments on the loan throughout the construction term.

The amount of the interest reserve fund is calculated at the start of the construction term and an accurate calculation is critical to ensure that there’s enough money to make payments for the entirety of the construction period plus a buffer. To make the calculation, several key variables are required, including an estimation of the construction draw schedule.

In the event that the interest reserve runs out prior to the completion of construction, all parties have a strong incentive to work together to complete the project since it’s the only way they’ll be repaid. Options include a budget reallocation, additional loan, and/or borrower payment.

Lastly, if there’s one takeaway from this article it should be that construction rarely goes according to plan and the interest reserve calculation should include a buffer to account for unforeseen issues that could delay construction progress.

How to Calculate an Interest Reserve for a Construction Loan (2024)

FAQs

How to Calculate an Interest Reserve for a Construction Loan? ›

The amount of the interest reserve is generally calculated by multiplying the average outstanding balance of the loan by the interest rate and the length of the expected development/construction period.

How do you calculate interest reserve on a construction loan? ›

The most common interest reserve estimate I've seen is the following, with more detailed explanations below.
  1. Interest Reserve = ((50% x Loan Amount x Interest Rate) / 12) x Months of Construction.
  2. 50% is a rough estimate of the average outstanding loan proceeds over the entire construction period.

How much in reserves for a construction loan? ›

Bank lenders typically will lend a maximum of 75% LTC and private lenders up to 90% LTC. This means that the client will need to have 10-25% minimum equity (skin-in-the-game) and be fully dispersed of those funds before the lender's portion will kick in to fund the remainder.

How to calculate interest only on a construction loan? ›

You can calculate an approximate interest-only payment in the following way: Multiply the dollar amount advanced on the loan by the interest rate expressed as a decimal, and then divide that amount by 12.

How do you calculate interest during construction? ›

Multiply the average amount of the loan during the time it takes to complete the building of the asset by the interest rate and the development time in years. Subtract any investment income that pertains to the interim investment of the borrowed funds.

How do you calculate reserve amount? ›

The required reserve ratio can be calculated by simply dividing the amount of money a bank is required to hold in reserve by the amount of money it has on deposit. For example, if a bank has $10 million in deposits and $500,000 are required to be held in reserve, then the required reserve ratio would be 1/20 or 5%.

How do you calculate reserve estimation? ›

The reserve is estimated by multiplying total surface area, average thickness, and average Sp. Gr. The grade estimate is estimated by thickness weighted average grade of all drill holes.

How do you calculate reserve cost? ›

Reserve replacement cost (RRC) is calculated by dividing development, exploitation, exploration and acquisition capital expenditures, reduced by proceeds of divestitures, for the period by net estimated proved reserve additions for the period from all sources, including acquisitions and divestitures.

How to calculate construction loan amount? ›

The lender will loan you a percentage of the appraised value of the home. So, for instance, if the home is appraised to be worth $500,000, they will loan you $500,000 x (95% as an example) = $475,000. The down payment will be your construction costs less the loan amount.

What is a construction reserve? ›

When financing new construction or a fix and flip project, a construction reserve is built into the loan structure by a Lender to fund the future costs of a construction or renovation project. These funds are often held by the Lender, or an intermediary called a Fund Control service provider.

What is the formula for calculating interest only? ›

To calculate interest-only loan payments, multiply the loan balance by the annual interest rate, and divide it by the number of payments in a year. For example, interest-only payments on a $50,000 loan with a 4% interest rate and a 10-year repayment term would be $166.67.

How does interest work on a construction loan? ›

During the construction-loan phase, you're only responsible for interest payments on the money drawn, as it's drawn. After the conversion, you start making payments that cover interest and the principal — as you would with any mortgage.

Are construction loans always interest only? ›

Funds are released in stages as the construction progresses, which can help manage costs. You can usually convert the construction loan to a traditional mortgage once the construction is complete. You only pay interest on the amount you've borrowed during the construction phase.

What is the formula for interest reserve? ›

The amount of the interest reserve is generally calculated by multiplying the average outstanding balance of the loan by the interest rate and the length of the expected development/construction period.

What is the correct way to calculate interest? ›

The formula for calculating simple interest is A = P x R x T.
  1. A is the amount of interest you'll wind up with.
  2. P is the principal or initial deposit.
  3. R is the annual interest rate (shown in decimal format).
  4. T is the number of years.

What is capitalizing interest on a construction loan? ›

Capitalization of interest refers to the practice of allowing the borrower to accrue interest due on principal disbursem*nts made during the construction of a project, and then add the accrued but unpaid interest into the principal loan/guarantee amount.

How do you calculate project reserve? ›

A common method for estimating the management reserve is to add 5-10% of the cost baseline for the management reserve. Assuming a cost baseline of $121,000 and a 5% management reserve, the project manager would calculate the management reserve as $6,050 (i.e., $121,000 x 5%).

How are reserves calculated for mortgage? ›

To calculate mortgage reserves, simply multiply your monthly mortgage payment by the number of months your lender requires in reserves. For example, if your monthly mortgage payment is $1,800 and you need three months of reserves, you'd need a total of $5,400, either in cash or savings or other liquid assets.

Top Articles
FAQs | SmartRewards
RSA-and-RC4-Cryptosystem-Performance-Evaluation-Using-Image-and-Text-File.doc
Maxtrack Live
Kevin Cox Picks
7 Verification of Employment Letter Templates - HR University
Week 2 Defense (DEF) Streamers, Starters & Rankings: 2024 Fantasy Tiers, Rankings
Restaurer Triple Vitrage
Lamb Funeral Home Obituaries Columbus Ga
Kaydengodly
America Cuevas Desnuda
Kristine Leahy Spouse
Jonathan Freeman : "Double homicide in Rowan County leads to arrest" - Bgrnd Search
J Prince Steps Over Takeoff
Walgreens On Nacogdoches And O'connor
What Was D-Day Weegy
Housework 2 Jab
How Much Is Tj Maxx Starting Pay
Luna Lola: The Moon Wolf book by Park Kara
Google Flights Missoula
Mflwer
Marine Forecast Sandy Hook To Manasquan Inlet
Universal Stone Llc - Slab Warehouse & Fabrication
Laveen Modern Dentistry And Orthodontics Laveen Village Az
‘The Boogeyman’ Review: A Minor But Effectively Nerve-Jangling Stephen King Adaptation
Craigslist St. Cloud Minnesota
Ontdek Pearson support voor digitaal testen en scoren
Labcorp.leavepro.com
How do you get noble pursuit?
TJ Maxx‘s Top 12 Competitors: An Expert Analysis - Marketing Scoop
Craigslist Boerne Tx
Lawrence Ks Police Scanner
Craigslist Central Il
Mg Char Grill
Kokomo Mugshots Busted
Lowell Car Accident Lawyer Kiley Law Group
Uhaul Park Merced
آدرس جدید بند موویز
Jennifer Reimold Ex Husband Scott Porter
Agematch Com Member Login
Asian Grocery Williamsburg Va
42 Manufacturing jobs in Grayling
Daily Jail Count - Harrison County Sheriff's Office - Mississippi
8005607994
Walgreens Agrees to Pay $106.8M to Resolve Allegations It Billed the Government for Prescriptions Never Dispensed
Red Dead Redemption 2 Legendary Fish Locations Guide (“A Fisher of Fish”)
Todd Gutner Salary
Sea Guini Dress Code
Graduation Requirements
What your eye doctor knows about your health
Marion City Wide Garage Sale 2023
Shad Base Elevator
Latest Posts
Article information

Author: Fredrick Kertzmann

Last Updated:

Views: 5958

Rating: 4.6 / 5 (46 voted)

Reviews: 93% of readers found this page helpful

Author information

Name: Fredrick Kertzmann

Birthday: 2000-04-29

Address: Apt. 203 613 Huels Gateway, Ralphtown, LA 40204

Phone: +2135150832870

Job: Regional Design Producer

Hobby: Nordic skating, Lacemaking, Mountain biking, Rowing, Gardening, Water sports, role-playing games

Introduction: My name is Fredrick Kertzmann, I am a gleaming, encouraging, inexpensive, thankful, tender, quaint, precious person who loves writing and wants to share my knowledge and understanding with you.