FAQ | Irish Eco Homes | Timber Frame Advantages | Timber Frame Disadvantages | Timber Frame Houses Ireland| Eco House Ireland Prices| Kit Houses Ireland (2024)

  1. What are the benefits of timber frame?
  2. What wood is used for the frame?
  3. How long will a timber frame last?
  4. Will a timber frame house look different?
  5. Are timber frames more prone to fires?
  6. Is timber frame energy efficient?
  7. What are your U values?
  8. Can I use underfloor heating to all floors?
  9. What heating system can we install ?

  10. Will the floors squeak?

  11. When does the plasterboard arrive?
  12. Do all the components arrive at once?
  13. Does the house come with a guarantee/warranty?
  14. Do you put the frame up?
  15. Will you check the base before delivery ?
  16. Can I get a mortgage on a timber frame?
  17. What areour payment terms?
  18. Will I pay VAT on theframepackage?
  19. Is the insurance different on a timber frame?
  20. How much will the build cost?
  21. Do you do the full build?
  22. How long will my build take?
  23. Do I have to build the house myself?
  24. Is timber frame cheaper than using block?
  25. What happens after the frame is erected?
  26. What happens if it rains when my frame is on site?
  27. Does a timber frame comply with fire safety standards?

What are the benefits of timber frame?

PERFORMANCE

  • Timber-frame buildings from Irish Eco Homes are typically more energy efficient than those constructed using other methods of construction. They;
  1. are highly insulated – reducing heat loss through external walls and roofs
  2. airtight – which reduces uncontrolled heat loss through unpleasant draughts
  3. benefit from minimal cold bridging – which eliminates uncomfortable cold spots
  • Easy to control, energy efficient, thermally responsive internal environments reduce the risk of over-heating
  • Structural timber solutions available for almost every type of building
  • Factory based manufacturing improves quality and dimensional accuracy

SUSTAINABILITY

  • A renewable material from sustainable forests with independent chain of custody certification to prove this
  • A natural product that removes carbon dioxide from the environment as it grows (sequesters carbon as it grows) and stores it for the lifetime of the building
  • A material with lower embodied energy than all other mainstream construction materials
  • Products that are re-used, re-cycled and then recovered to produce energy
  • Making zero waste on site a reality

FLEXIBILITY

  • An unrivalled range of structural timber solutions with unbeatable versatility and flexibility
  • Materials that are easy to work with in the factory and on-site offering limitless easy to customise design options
  • A wide range of specifications and solutions available for almost every application

AFFORDABILITY

  • The low cost route to energy efficient buildings that reduce the need for renewable technologies
  • Fabric first, energy efficiency reduces running costs for life
  • Faster build times reduces site preliminary and labour costs
  • Timber frame is tried, tested and widely used
  • More price certainty
  • Fewer build delays caused by bad weather, meaning a more predictable build programme

What wood is used for the frame?

The structural timber used in the wall panels is generally European whitewood which is strength graded and kiln dried so that it is appropriate for construction purposes.

Almost all of the timber we use is independently certified by the FSC or PEFC to be from sources with genuine sustainability credentials.

How long will a timber frame last?

The short answer is that buildings constructed using timber frame construction will last as long as those constructed from any other mainstream construction method.

The products, systems and methods used today are underpinned by a rigorous regulations, standards and third party certification systems all designed to ensure that when adequately maintained all buildings perform to expected and accepted levels.

Will a timber frame house look different?

Your house will look exactly as you want it to. Some of our customers choose to make it obvious that they live in a timber frame house others don’t. It’s entirely up to you. For example, if you fullyblock and plaster yourhome no one would know it was timber frame.

Are timber frames more prone to fires?

No, all buildings constructed in the Ireland, no matter what method is used, must adhere to the same set of Building Regulations. Statistics on fires in buildings demonstrate that the number of fires in timber frame buildings correlates very closely with the number of fires in buildings constructed in other ways.

Is timber frame energy efficient?

In short, timber frame is one of the most energy efficient methods of construction available today. Modern Building Regulations require all new houses to achieve a proscribed minimum level of energy efficiency and these days the regulations really are quite stringent.

However, many Irish Eco Homes customers want to improve further the energy efficiency of their properties, and our timber frame system is the best method of construction to be using if this is what you want to do. We adopt a fabric first approach to energy efficiency where the insulation is installed into the structure of the building on a fit and forget basis.

What are your U values?

U values provide a measure of heat loss for building elements (eg. complete wall, floor and roof constructions) and are expressed in W/m2K. They show the amount of heat lost in watts (W) per square meter of building element when the temperature (K) outside is at least one degree lower than that inside the building.

The lower the U value, the better the insulation provided by the element. It is important to remember that individual materials do not have U-values, only complete elements, and that all of the materials used in the construction of the element will contribute something to its performance.

Typically the external walls we provide will have a U-valuebetter than 0.17 W/m2K although we frequently provide walls with much lower U-values down to0.10

It’s also equally important to note that U-values are only one small part of what determines building envelope energy efficiency; providing an airtight structure and minimising thermal bridging are equally important.

Can I use underfloor heating to all floors?

Yes you can. Many of our customers install underfloor heating on the ground floor of their properties (usually constructedof concrete) and some install it on the first floor as well, although people often opt for conventional radiators upstairs.

One way to incorporate underfloor heating on the first floor of your home is to use a lightweight screed to cover the heating elements. A number of products are available to screed at first floor level, however you must take this into consideration at the design stage of your house as the floor joists will have to be designed to take into account the additional loadings that this type of floor creates.

What heating system can we install ?

All common systems can easily be accommodated.

Will the floors squeak?

We provide kiln-dried solid softwood joists as a standardoption and use a high qualitysmartply floor deck which is glued and nailed to the joists to help eliminate any chance of the floor squeaking.

Many of our customers now opt for open metal web floor joists rather than solid timber. This type of floor construction makes it much easier to incorporate services into the floor zone without the risk of follow-on trades damaging the structure of the building. They also make it easier to include longer spans within the design of your new home.

When does the plasterboard arrive?

The plasterboard is provided on a client call off basis if it is included with the package and is dropped on site close to an entrance door. It is the clients responsibility to carry it into the house and protect it from weather and damage.

Do all the components arrive at once?

No. We will maximise our deliveries to site with full loads to suit the frame erection schedule i.e. we wouldn’t expect to send the roof trusses out on day one.

Other items such as plasterboard and acoustic insulations are supplied on a call off basis.Please remember they will be subject to supplier lead times which are normally around 1-2 weeks.

Do you offer a guarantee/warranty?

As part of the build, a structural certificate is provided.You can arrangea ten year structural warranty via Homebond.

Do you put the frame up?

99% of our frames are provided on a supply and erect basis. This has some advantages with VAT

Will you check the base before delivery?

It is the responsibility of the sub-contractor to verify that the base is built to specification. Our erectors will check the base as they lay the sole plate but expect it to have beenconstructed accurately.

Can I get a mortgage on a timber frame?

Yes, timber frame is the most widely used structural system in the developed world.

What areour payment terms?

Our standard terms are 5% non refundable booking deposit on placement of order with a payment 50%of the balance prior to manufacture . The final 50% of balance is due on the completion of the erection of the structural frame subject to receipt of an appropriate payment guarantee which is required prior toerection.

Will I pay VAT on theframepackage?

VAT will be charged at the prevailing rate on all the supply only items in the package. It is a 13.5% rate for the main part of the frame provided this is erected by us.

Is insurance different on a timber frame?

No, there is no difference in the buildings insurance required for a timber frame building.

How much will the build cost?

The cost of the build will depend upon many different factors. Architectural style, size of property, ground conditions and level of specification all have a bearing on the build cost as well as your location and the route which you intend to use to undertake the construction work.

Whilst we can provide an indication of your likely build costs, we always recommend that you obtain expert advice from a Quantity Surveyor when establishing your budget. The good news is that self building is without doubt the most affordable and cost effective way of building your dream home and can yield savings of up to 30% when compared to buying a new house from a builder or developer.

Do you do the full build?

We are able to offer a turnkey solution on a local basis for those self builders who do not have the time or confidence to manage the project themselves. This service is provided through recommended builders.

How long will my build take?

Usinga detailed build programme, you can expect to complete the construction element of your project in20 to 25weeks. Remember that prior to this, you will need to have your planning permission and approvals in place, which may take up to 12 weeks.

Do I have to build the house myself?

No, you can appoint a project manager or main contractor to handle the build. Alternatively, you could manage the project yourself on a self build basis.

Is timber frame cheaper than block?

Timber frame and masonry are normally very similar in cost, though much will depend upon the specifics of the design. When comparing different build methods it’s important to ensure that performance levels between different systems are similar and that the timescales involved are understood.

Timber frame is credited as being one of the fastest and most reliable methods of build as much of the work is done off site in factory conditions. Faster build times reduce site preliminary and labour costs and as there is less chance for things to go wrong or delays to be caused by bad weather, the price of a timber frame build is much more certain, which is a major benefit for the self-builder

What happens after the frame is erected?

Followingourframe check and handover the followon tradessuch as theroofer can commence and the window’s can be installed. No electrical of plumbing first fix should commence before the airtightness measures have been completed.

What happens if it rains on site?

The timber used in our products is kiln dried to low moisture levels. Exposure to rain during erection will not have any adverse effect as the timber will quickly dry out once the roof has been felt and battened. However, to ensure that exposure is kept to a minimum, we recommend that roof coverings are fixed immediately following completion of the timber structure. Damage to membranes should also be repaired as and when necessary.

Does a timberframe comply with fire safety standards?

We have tested our wall panel in accordance with the appropriate European Test method, IS EN1365-1: 2012 Fire resistance tests for loadbearing elements, and proven compliance (in fact we far exceed the minimum compliance requirements).

FAQ | Irish Eco Homes | Timber Frame Advantages | Timber Frame Disadvantages | Timber Frame Houses Ireland| Eco House Ireland Prices| Kit Houses Ireland (2024)
Top Articles
How much is $50 Google Play Gift Card in Naira? | Hook - Sell Gift Cards To Naira in Nigeria at the Best Rates Today
Long-Term Effects of Missing Teeth | Walbridge Dental | Ohio
Scheelzien, volwassenen - Alrijne Ziekenhuis
Mate Me If You May Sapir Englard Pdf
Arkansas Gazette Sudoku
Readyset Ochsner.org
What happens if I deposit a bounced check?
Craigslist - Pets for Sale or Adoption in Zeeland, MI
Stolen Touches Neva Altaj Read Online Free
Compare the Samsung Galaxy S24 - 256GB - Cobalt Violet vs Apple iPhone 16 Pro - 128GB - Desert Titanium | AT&T
Call Follower Osrs
Aquatic Pets And Reptiles Photos
The ULTIMATE 2023 Sedona Vortex Guide
7543460065
The Largest Banks - ​​How to Transfer Money With Only Card Number and CVV (2024)
Trac Cbna
Toy Story 3 Animation Screencaps
Willam Belli's Husband
Erica Banks Net Worth | Boyfriend
Marion City Wide Garage Sale 2023
yuba-sutter apartments / housing for rent - craigslist
Roane County Arrests Today
'Insidious: The Red Door': Release Date, Cast, Trailer, and What to Expect
Healthy Kaiserpermanente Org Sign On
Schooology Fcps
Sinfuldeed Leaked
Pay Stub Portal
Perry Inhofe Mansion
Autotrader Bmw X5
Workboy Kennel
Kokomo Mugshots Busted
Forager How-to Get Archaeology Items - Dino Egg, Anchor, Fossil, Frozen Relic, Frozen Squid, Kapala, Lava Eel, and More!
Cheap Motorcycles Craigslist
A Man Called Otto Showtimes Near Carolina Mall Cinema
Goodwill Thrift Store & Donation Center Marietta Photos
Senior Houses For Sale Near Me
The Boogeyman Showtimes Near Surf Cinemas
Ukg Dimensions Urmc
Greater Keene Men's Softball
Koninklijk Theater Tuschinski
Publictributes
St Anthony Hospital Crown Point Visiting Hours
Danielle Ranslow Obituary
Thotsbook Com
Celsius Claims Agent
Reilly Auto Parts Store Hours
3500 Orchard Place
Caesars Rewards Loyalty Program Review [Previously Total Rewards]
Premiumbukkake Tour
Latina Webcam Lesbian
Jeep Forum Cj
2121 Gateway Point
Latest Posts
Article information

Author: Stevie Stamm

Last Updated:

Views: 5698

Rating: 5 / 5 (80 voted)

Reviews: 87% of readers found this page helpful

Author information

Name: Stevie Stamm

Birthday: 1996-06-22

Address: Apt. 419 4200 Sipes Estate, East Delmerview, WY 05617

Phone: +342332224300

Job: Future Advertising Analyst

Hobby: Leather crafting, Puzzles, Leather crafting, scrapbook, Urban exploration, Cabaret, Skateboarding

Introduction: My name is Stevie Stamm, I am a colorful, sparkling, splendid, vast, open, hilarious, tender person who loves writing and wants to share my knowledge and understanding with you.