Computation - Operations Management/Industrial Engineering (2024)

Computation - Operations Management/Industrial Engineering (1) The add-in provides the Beta distribution as an option for the probability distribution. Beta distributions are useful because they are defined between a minimum and maximum value, many different shapes are available depending on the parameters chosen, and, for some parameter choices, the distribution has a well defined mode (most likely point). The distribution has four parameters, alpha, beta, minimum and maximum. The picture below shows three examples of symmetric Beta distributions. For symmetric distributions alpha and beta are the same. As their values increase the distributions become more peaked. The uniform distribution has alpha and beta both equal to 1. This does not have a well defined mode because every point has the same probability. Distributions with alpha and beta less than 1 are bathtub shaped curves and are not useful for modeling activity times.

Computation - Operations Management/Industrial Engineering (2)

Asymmetric distributions are obtained by choosing alpha and beta to be different. The picture below shows several cases with alpha held constant at 2. The greater the difference between alpha and beta the greater the asymmetry. The asymmetric examples are all skewed to the right because alpha is less than beta. To obtain distributions skewed to the left choose alpha greater than beta.

Computation - Operations Management/Industrial Engineering (3)

The generalized Beta distribution has a range other that 0 to 1 and has the extra parameters defining the minimum and maximum. The generalized Beta distributions look the same as the pictures above but are spread out and/or shifted.

The notation for the generalized Beta distribution and equations for the mean, variance and mode (or most likely value) are shown below. The mode is interesting to project analysis, because it is used as a parameter in the traditional analysis.

It is interesting to compare this with the traditional PERT method for calculating the mean and variance. Here the mode is a parameter. The Beta distribution allows much more variety for the variance of the distributions.

Computation - Operations Management/Industrial Engineering (6)

The table below shows the mean, variance and mode values for the five different Beta distributions pictured above and compares the results with the traditional calculations of the mean and variance. All have the range 0 to 1.

Alpha

Beta

Mean

Variance

Mode

Trad. Mean

Trad. Var.

1

1

0.5

0.083

***

***

***

2

2

0.5

0.050

0.5

0.5

0.028

5

5

0.5

0.023

0.5

0.5

0.028

2

3

0.4

0.040

0.33

0.389

0.028

2

5

0.286

0.026

0.2

0.3

0.028

There is no mode defined for the uniform distribution described by the first case. For the other cases the traditional variance calculation yields the same result since it only depends on the range. For asymmetric cases, the difference between the Beta distribution mean and the traditional mean increases as the distribution becomes more skewed.

For project analysis we may be given the mode and require values of the shape parameters, alpha and beta, to specify the Beta distribution. Formulas for two cases are below. In each case we must choose one parameter and solve for the other.

When the mode is equal to one of the limits, only one of the equations is valid.

Beta Example

To use a Beta distribution to model activity times, select Distribution for the activity times and click the Beta distribution button.

Computation - Operations Management/Industrial Engineering (8)

We have modified the example problem to use Beta distributions for all times except the Start and End activities. Activities B and D are degenerate in that the min and max values are the same. We set alpha and beta to 2 for these cases. For all the other activities except K and L, we set alpha equal to 2 and solved for beta using the second equation above. That equation does not work for K and L because the mode is equal to the upper bound. In these cases we set beta equal to 2 and solved for alpha. It happens that alpha is equal to 1. This is a special case of the Beta distribution that has the form of a triangular distribution.

Computation - Operations Management/Industrial Engineering (9)

We solve the problem with the Beta distribution and compare to the traditional results below. We see that the critical path is the same in each case, but the sum of the mean values for the critical path are greater than the traditional resulting in a late project rather than one with slack. The variance for the Beta assumption is also greater, resulting in a smaller probability that the critical path time will be less than the due date.

Beta

Computation - Operations Management/Industrial Engineering (10)

Traditional

Computation - Operations Management/Industrial Engineering (11)

Other Distributions

The random variables add-in allows several different distributions. They can be used for the project management add-in by simply replacing the name of the distribution and specifying the parameters in the cells immediately to the right of the name. The figure below shows the Beta distribution replaced with other distributions allowed by the Random Variables add-in. We have replaced the titles at the top of columns H through K with general names since the distributions all have different parameters. For the Normal distribution only two parameters are necessary, the mean and standard deviation. These are placed immediately to the right of the name Nor. The remaining parameter spaces are filled with zeros. The complete name could be spelled out, because only the first three letters are used by the add-in, except in the case of the integer uniform and triangular distributions. Review the discussion of the Random Variables add-in to see how the parameters are presented for the various distributions.

Computation - Operations Management/Industrial Engineering (12)

The equations in the mean and variance columns refer to the range defining the random variables as illustrated at the bottom of the figure. These functions are user defined functions provided by the Random Variables add-in.

The use of probability distributions may not yield more accurate results than single estimates. They are however, an explicit indication that uncertainty is present.

Computation - Operations Management/Industrial Engineering (13)

Computation - Operations Management/Industrial Engineering (2024)
Top Articles
Guide to Fraud Prevention, Part 1: Hardware | CertifID
It is safe to gargle with hydrogen peroxide if it’s been diluted with water
What Is Single Sign-on (SSO)? Meaning and How It Works? | Fortinet
Kostner Wingback Bed
Chs.mywork
Walgreens Harry Edgemoor
Koopa Wrapper 1 Point 0
13 Easy Ways to Get Level 99 in Every Skill on RuneScape (F2P)
Fusion
Red Wing Care Guide | Fat Buddha Store
Pike County Buy Sale And Trade
AB Solutions Portal | Login
83600 Block Of 11Th Street East Palmdale Ca
Weather In Moon Township 10 Days
Athens Bucket List: 20 Best Things to Do in Athens, Greece
Cooking Fever Wiki
Flower Mound Clavicle Trauma
Five Day National Weather Forecast
Dit is hoe de 130 nieuwe dubbele -deckers -treinen voor het land eruit zien
Les Schwab Product Code Lookup
I Touch and Day Spa II
Are They Not Beautiful Wowhead
Mani Pedi Walk Ins Near Me
Gdp E124
Aldi Süd Prospekt ᐅ Aktuelle Angebote online blättern
O'Reilly Auto Parts - Mathis, TX - Nextdoor
Www.dunkinbaskinrunsonyou.con
Reicks View Farms Grain Bids
Impact-Messung für bessere Ergebnisse « impact investing magazin
Harbor Freight Tax Exempt Portal
When His Eyes Opened Chapter 3123
Great ATV Riding Tips for Beginners
Ascensionpress Com Login
Kaliii - Area Codes Lyrics
October 31St Weather
Bismarck Mandan Mugshots
159R Bus Schedule Pdf
Tsbarbiespanishxxl
Skyward Marshfield
Locate phone number
Cocaine Bear Showtimes Near Cinemark Hollywood Movies 20
Lady Nagant Funko Pop
Muni Metro Schedule
Meee Ruh
Clock Batteries Perhaps Crossword Clue
De boeken van Val McDermid op volgorde
Bismarck Mandan Mugshots
Steam Input Per Game Setting
French Linen krijtverf van Annie Sloan
Fresno Craglist
Costco Gas Price Fort Lauderdale
Swissport Timecard
Latest Posts
Article information

Author: Barbera Armstrong

Last Updated:

Views: 5395

Rating: 4.9 / 5 (59 voted)

Reviews: 90% of readers found this page helpful

Author information

Name: Barbera Armstrong

Birthday: 1992-09-12

Address: Suite 993 99852 Daugherty Causeway, Ritchiehaven, VT 49630

Phone: +5026838435397

Job: National Engineer

Hobby: Listening to music, Board games, Photography, Ice skating, LARPing, Kite flying, Rugby

Introduction: My name is Barbera Armstrong, I am a lovely, delightful, cooperative, funny, enchanting, vivacious, tender person who loves writing and wants to share my knowledge and understanding with you.